Astronet Поиск по астрономическим сайтам English Russian
       
        Точная форма слов   О проекте   Сайты   Справка
Найдено документов: 353890 (178 сайтов) ---- Время поиска: 0.96сек.   

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | След.

Показаны документы, содержащие фрагменты текста из документа
http://www.stsci.edu/ftp/observing/status_reports/old_reports_94/hst_status_02_11_94.

1. http://www.stsci.edu/ftp/observing/status_reports/old_reports_94/hst_status_05_16_94
HUBBLE SPACE TELESCOPE DAILY REPORT #1140 PERIOD COVERED: 0700 EST Daily Status Report as of 137/1200Z. 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: 1.1 Completed WF/PC-2 5446 (The Nuclei of Nearby S0 and Spiral Galaxies) The WF/PC-2 was used to make observations of galaxy NGC-4546. The observations were executed as scheduled. ... 1.14 Completed WF/PC-2 5092 (GTO Low Latitude Parallel Program: Cycle 4) The WF/PC-2 was used to make observations taken in parallel with the prime science observations. ...
[ Сохраненная копия ]  Ссылки http://www.stsci.edu/ftp/observing/status_reports/old_reports_94/hst_status_05_16_94 -- 7.6 Кб -- 17.05.1994
Похожие документы

2. GALFA - H I Projects
GALFA - H I Projects . The table below summarizes approved GALFA H I projects. Some project names link to project web sites. All scheduled project IDs link to the relevant proposal abstract in the telescope schedule database , which also lists scheduled observations for each project. If these exceed the requested observing time, a project is deemed completed ; otherwise, it is either in progress or not yet scheduled , depending on whether observations have begun. ... Goldston . ...
[ Сохраненная копия ]  Ссылки http://www.naic.edu/alfa/galfa/galfa_hi_projects.shtml -- 13.4 Кб -- 02.10.2012
Похожие документы

3. LBA Block Schedule for 2013OCT
ATNF Home . About ATNF . ... About ATNF overview . ... Governance overview . Australia Telescope Steering Committee . ... Our people overview . ... Murchison Radio-astronomy Observatory . ... Parkes radio telescope . ... Mopra radio telescope . ... Observing schedules . ... Visiting Parkes radio telescope . ... Parkes radio telescope webcam . ... A summary of the schedule in text format. The schedule in postscript format. The schedule in pdf format. The schedule in png format . ...
[ Сохраненная копия ]  Ссылки http://www.atnf.csiro.au/vlbi/schedules/lba/2013oct.html -- 26.0 Кб -- 10.04.2016
Похожие документы

4. Small, Fast and Reusable: A Satellite Planning and Scheduling System
Next: Recent Improvements to HST Parallel Scheduling . Up: Observatory Planning and Scheduling . ... The SWAS planning and scheduling system provides all functions from ephemeris processing to guide star selection to timeline generation. ... The Submillimeter Wave Astronomy Satellite is 600 lb NASA Small Explorer satellite launched into a 650 km orbit on 12/5/98. ... The planning and scheduling system provides all the functions required to plan, schedule and command SWAS. ... The schedule . ...
[ Сохраненная копия ]  Ссылки http://www.adass.org/adass/proceedings/adass98/kleinersc/ -- 13.6 Кб -- 16.07.1999
Похожие документы

5. Main research and development work completed in 2009 and ready for
... Space Research Institute . ... Main research and development work completed in 2009 and ready for implementation . ... Development of the Northern Eurasia land cover map based on medium spatial resolution satellite data. ... The research and development has been completed of the first in Russia and in the whole world high-speed digital streams decoder for space and satellite channels with extremely high noise levels. ... Main research and development work completed in 2008 and ready for...
[ Сохраненная копия ]  Ссылки http://www.iki.rssi.ru/eng/niokr2009.htm -- 7.7 Кб -- 18.07.2011
[ Сохраненная копия ]  Ссылки http://www.cosmos.ru/eng/niokr2009.htm -- 7.7 Кб -- 18.07.2011
Похожие документы

6. ESO - MUSE Science Verification Completed
... Observatory . ... Science . ... Science Users Information > Science Publications > Science Announcements > MUSE Science Verification Completed . ... Observing Facilities . ... Instrumentation Development . ... Observing with ESO Telescopes . ... ESO Data . ... Of the 86 proposals submitted for the Science Verification (SV) of MUSE , a total of 49 proposals were allocated. ... All the SV data are available to the whole user community, subject to the VLT Science Verification Policy and Procedures . ...
[ Сохраненная копия ]  Ссылки http://www.eso.org/sci/publications/announcements/sciann14032.html -- 23.3 Кб -- 10.04.2016
Похожие документы

7. XMM-Newton SAS Download Feedback
... Data Analysis SAS News What is SAS? How to use SAS SAS Workshops SAS Version Changes Download and Install SAS Science Simulator (SciSim) . ... Is this going to be your first download of the SAS? ... Which version of the SAS do you intend to download? SAS version? RedHat 9 RedHat Enterprise Linux 4 RedHat Enterprise Linux 3 Fedora Core 3 SuSE 8.2 SuSE 7.3 Solaris 9 Solaris 8 Mac OS X 10.4 Mac OS X 10.2 VMWare for Windows . ... How many SAS users are going to be served through your download? ...
[ Сохраненная копия ]  Ссылки http://xmm.vilspa.esa.es/sas/7.0.0/download/download_form.php -- 23.0 Кб -- 10.04.2016
Похожие документы

8. S.P.Korolev RSC Energia - MIR ORBITAL COMPLEX
MAIN ACTIVITY RESULTS UNDER MIR ORBITAL COMPLEX . OPERATION PROGRAM AT THE TURN OF THIRD MILLENIUM . All activities foreseen by the Flight Test Program of Permanent Man-Tended Modular-type MIR Station with regard to validation of development, assembly and operation for permanent man-tended orbital complexes, and scheduled research activities were completed in accordance with the approved program. ... INTERNATIONAL SPACE STATION | ... Official WEB-site of S.P.Korolev RSC Energia . ...
[ Сохраненная копия ]  Ссылки http://www.energia.ru/english/energia/mir/mir-works.html -- 8.5 Кб -- 02.10.2012
Похожие документы

9. C.J. Butler, Research Astronomer
Next: J.E. Chambers, Research Astronomer Up: Research Previous: Research Contents . ... Solar Variability and Climate . Other Activities . ... Applied to data of flares on Gliese866 he was able to estimate the area of hydrogen emitting flare regions as 1-13% of the stellar surface. ... As partners in the project, Armagh Observatory has been asked to contribute to the selection process in exchange for priority access to the data which will eventually flow from the satellite. ...
[ Сохраненная копия ]  Ссылки http://star.arm.ac.uk/annrep/annrep99/node10.html -- 10.7 Кб -- 05.05.2000
Похожие документы

10. Program use
Next: Algorithm Up: Description of program searchdup Previous: Program parameters . Program is started by the command searchdup with no parameters. The graphic user interface appears, with all parameters to their default value. After parameter entry, the button START starts data processing. ... It is possible to stop the program clicking button BREAK! ... It is then possible to change some parameters, or to exit the program, by clicking on the EXIT button. ... 2000-06-30 ...
[ Сохраненная копия ]  Ссылки http://www.arcetri.astro.it/science/Radio/red/searchdup/node3.html -- 3.3 Кб -- 30.06.2000
Похожие документы
Еще в разделе: (Показать все результаты (>6926) - www.arcetri.astro.it/ )

11. Introduction
... For scheduling purposes, the Compton Gamma Ray Observatory mission has been divided into phases corresponding to proposal cycles. Phase 1 lasted from 1991 April, through 1992 November, and constituted the first complete survey of the gamma-ray sky. ... Viewing periods have lasted from a few days to three weeks. ... In most cases, the gaps between viewing periods are a few hours, the time needed to re-point and stabilize the Compton Observatory. ...
[ Сохраненная копия ]  Ссылки http://www.sao.ru/cats/doc/EGRET2/node3.html -- 3.3 Кб -- 08.05.1998
Похожие документы

12. SDSS Telescope
. Caption above photo . The manipulator arm installation is all but complete. French Leger/FNL, displays its installation. Carl Lindenmeyer, Ron Miksa, and Jerry Zimmerman (all FNL), as well as John Korienek and Don Goloskie (not pictured) helped install the arm. Wednesday night the arm was used during the transfer of the engineering camera. Unfortunately, one of the operator control handles was broken. Redesign is in progress. Photos taken by Gretchen Van Doren/APO and Russ Owen/UW.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Site/SDSS.progress/990302manarm2/manarm2.html -- 1.8 Кб -- 04.03.1999
Похожие документы

13. Электронная библиотека астронома-любителя. RU.SPACE.NEWS - архив за 26 марта
Электронная библиотека астронома-любителя. ... библиотека . архив RSN . ... Ru.Space.News: . Март 1998 . ... Дата: 26 марта 1998 (1998-03-26) От: Alexander Bondugin Тема: STARDUST Update - March 20, 1998 Привет всем! ... TELEPHONE (818) 354-5011 http://www.jpl.nasa.gov Galileo Europa Mission Status March 25, 1998 NASA's Galileo spacecraft is sending to Earth the final pictures and science information stored on its onboard tape recorder during the December 1997 flyby of Jupiter's moon Europa. ...
[ Сохраненная копия ]  Ссылки http://www.astrolib.ru/rsn/1998/03/26/ -- 14.8 Кб -- 09.04.2016
Похожие документы

14. Correlator Products
Next: Mission Operations Data Transfer . ... VLBI Tape Management . VLBI Tapes . ... When: As soon as the correlator is satisfied with the correlator output. back to top . ... What: Each correlator will maintain a data base including the status of all VLBI tapes under its control. ... The correlators will distribute tapes to mission elements based on the Observation Summary File produced by the RSOG ( Observation Summary File ) to ensure each element has enough tapes to support SVLBI observations. ...
[ Сохраненная копия ]  Ссылки http://www.asc.rssi.ru/RadioAstron/documents/rmoh/eng/correl.htm -- 9.1 Кб -- 17.05.2001
Похожие документы

15. The Common Room roof is completed
... Gallery . ... The Common Room roof is completed . Sidebar Left . Sidebar Top . No Sidebar . Sidebar Bottom . Sidebar Right . ... Title: The Common Room roof is completed . Description: NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission. ... The Common Room roof is completed NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission. ...
[ Сохраненная копия ]  Ссылки http://www.mso.anu.edu.au/gallery3/index.php/reconstruction/Rebuilding-the-Commonwealth-Solar-Observatory/27-Feb-07-3 -- 36.9 Кб -- 11.04.2016
Похожие документы

16. The Sun - a summer without activity
... Precisely one month ago, on 11 July 2009, the last active area of the new solar cycle disappeared from the surface of the Sun. Over the 30 days following this, neither observers on Earth nor devices in space have been able to detect the emergence of any sunspots. ... Therefore, it seems that our star has once again returned to a state of deep solar "winter", following several sparks of activity in May-June 2009. ... To date, this period has lasted 30 days. ...
[ Сохраненная копия ]  Ссылки http://www.tesis.lebedev.ru/en/info/tesis_20090811_en.php -- 9.7 Кб -- 01.10.2012
Похожие документы
Еще в разделе: (Показать все результаты (>19480) - www.tesis.lebedev.ru/ )

17. Astronaut Bio: Alfred Merrill Worden
... Alfred Merrill Worden . NASA Astronaut (former) . ... Married to Jill Lee Worden (Hotchkiss). ... He served as a member of the astronaut support crew for the Apollo 9 flight and as backup command module pilot for the Apollo 12 flight. ... Scott and Irwin collected approximately 171 pounds of lunar surface materials on their three expeditions onto the lunar surface; and Worden logged 38 minutes in extravehicular activity outside the command module, "Endeavour." ...
[ Сохраненная копия ]  Ссылки http://www.jsc.nasa.gov/Bios/htmlbios/worden-am.html -- 7.1 Кб -- 07.07.2015
Похожие документы

18. Specialized space training (SST)
... Space flight . Crew training . ... Space camp . ... acquiring practical habits and skills of performing all the flight operations envisaged for a flight participant; . maintaining and honing professionally required qualities and skills for a successful activity in conditions of effect of adverse factors of a space flight, as well . ... preparing for the activity outside the spacecraft; . ... preparing for professional activity in conditions of effect of the space flight factors; . ...
[ Сохраненная копия ]  Ссылки http://www.atlasaerospace.net/eng/podgotovka-skp.htm -- 31.6 Кб -- 09.04.2016
Похожие документы
Еще в разделе: (Показать все результаты (>31) - www.atlasaerospace.net/ )

19. isaac_summary.html
... Observing Block (OB) time requirements per tile (including overheads): Band ExpTime Total Time ---- ------- ---------- J 3.5h 4.63 hours (3 OBs x 1.308h, + 1 OB x 0.704h) H 5h 6.75 hours (5 OBs x 1.350h) Ks 6h 8.60 hours (6 OBs x 1.433h) -------------------------- Total 19.98 hours Goal (with approved time): 12 tiles in H, 30 in J Ks ---------------------------------------------------- RA Dec OBs_done ExecTime ...
[ Сохраненная копия ]  Ссылки http://www.stecf.org/goods/releases/20040430/isaac_summary.html -- 3.9 Кб -- 10.05.2004
Похожие документы

20. Command name completion
This feature is only available with the Bourne Again Shell (bash). ... To complete a command name press the TAB key. tel <TAB> net telnet> . ... Pressing the TAB key again displays all the commands on your path that begin with those letters. For example: ma <TAB><TAB> mach mail makecookie man maze macptopbm make makedepend mapname . ... Command name completion also works in the middle of a command line. For example the command name teln <TAB> orion.geo.aber . ...
[ Сохраненная копия ]  Ссылки http://comet.sai.msu.ru/UNIXhelp/shell/cmd4.html -- 2.7 Кб -- 17.01.1997
Похожие документы

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | След.


Астронет | Научная сеть | ГАИШ МГУ | Поиск по МГУ | О проекте | Авторам

Комментарии, вопросы? Пишите: info@astronet.ru или сюда

Rambler's Top100 RFBR Яндекс цитирования