Äîêóìåíò âçÿò èç êýøà ïîèñêîâîé ìàøèíû. Àäðåñ îðèãèíàëüíîãî äîêóìåíòà : http://xmm.vilspa.esa.es/calibration/documentation/epic_cal_meetings/201103/lapalombara-cal-2011.pdf
Äàòà èçìåíåíèÿ: Tue May 13 17:40:53 2014
Äàòà èíäåêñèðîâàíèÿ: Wed Apr 13 13:39:46 2016
Êîäèðîâêà:

Ïîèñêîâûå ñëîâà: ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï ð ï
Status of the EGSE updating with SCOS 2000
Nicola La Palombara INAF ­ IASF Milano

XMM ­ EPIC Operation Meeting Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Project overview
Two on-ground EPIC Flight Spare instruments: 1 MOS camera at the Leicester University (UK) 1 PN camera at the MPE Panter facility of Munich (D) Both instruments are operated through the same Electrical Ground Support Equipment (EGSE) which was used for AIV tests before satellite integration.

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Project overview
Two on-ground EPIC Flight Spare instruments: 1 MOS camera at the Leicester University (UK) 1 PN camera at the MPE Panter facility of Munich (D) Both instruments are operated through the same Electrical Ground Support Equipment (EGSE) which was used for AIV tests before satellite integration.

old hardware, with high risk of irreparable failures Test Equipment designed for integration test purpouses, unsuitable to use ESA database and command procedures


N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Current configuration
Camera Head Electronic Chain power Power I/F Simulator OBDH bus TC TM EPIC CAMERA EPIC EGSE

OBDH Simulation Front-end Electronic

Interface Simulator Unit (ISU) L AN Instrument Station (IS) Central Check-out Equipment (CCOE)

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Activity proposed by Tony in 2005: to replace (part of) the current EGSE with an equipment running SCOS 2000, in order to fully reproduce on-ground the on-board status and to operate the FS chains with the same tools used by ESA.

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Activity proposed by Tony in 2005: to replace (part of) the current EGSE with an equipment running SCOS 2000, in order to fully reproduce on-ground the on-board status and to operate the FS chains with the same tools used by ESA. Main problems SCOS 2000 is a data server, which has been developed to manage from the ground stations the routine operations of the flying missions


it is not designed for an EGSE application, and requires a non-standard "ad hoc" installation for the EPIC FS cameras

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Activity proposed by Tony in 2005: to replace (part of) the current EGSE with an equipment running SCOS 2000, in order to fully reproduce on-ground the on-board status and to operate the FS chains with the same tools used by ESA. Main problems SCOS 2000 is a data server, which has been developed to manage from the ground stations the routine operations of the flying missions


it is not designed for an EGSE application, and requires a non-standard "ad hoc" installation for the EPIC FS cameras


SCOS 2000 communication protocol is based on TC/TM "frames" instead of packets

it is necessary to foresee an "adapter" to manage the ISU, in order to convert the SCOS commands into the OBDH protocol
N. La Palombara ­ INAF/IASF-Milano XMM ­ EPIC Operation Meeting Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Proposed new configuration
Camera Head Electronic Chain power Power I/F Simulator OBDH bus TC TM EPIC CAMERA EPIC EGSE

OBDH Simulation Front-end Electronic

Interface Simulator Unit (ISU) ISU Interface Adapter (ISUIA)

New S2K-based CCOE (MOC + SOC)

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000 Project (long) history 2006 2007 Feasibility evaluation Technical proposal Agreement between ESA and EPIC PI for task allocation (who does what) Contract to ex-LABEN (now Thales Alenia Space) for ISUIA development HW procurement Development of the ISUIA SW Failed attempt to install both MOC & SOC S2K SW on a single WS => separate installation on two different WSs S2K training at ESAC Delivery of S2K WSs to Thales and I/F tests with ISUIA Successful ISUIA acceptance test (with few pending issues) SW debugging
XMM ­ EPIC Operation Meeting Mallorca, 29 March 2011

2008

2009

2010

2011

N. La Palombara ­ INAF/IASF-Milano


Status of the EGSE updating with SCOS 2000

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Next steps


closure of open SW issues ISUIA delivery to LUX and end-to-end tests with the MOS camera ISUIA and S2K WSs delivery to PANTER facility and end-to-end tests with the PN camera

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011


Status of the EGSE updating with SCOS 2000

Next steps


closure of open SW issues ISUIA delivery to LUX and end-to-end tests with the MOS camera ISUIA and S2K WSs delivery to PANTER facility and end-to-end tests with the PN camera

Open matters




health status of the FS instruments: are they still working...? (possible damage of the PN Camera Head) availability of the FS instruments: are they ready for tests...? test planning (when? what?)

N. La Palombara ­ INAF/IASF-Milano

XMM ­ EPIC Operation Meeting

Mallorca, 29 March 2011