Документ взят из кэша поисковой машины. Адрес оригинального документа : http://xmm.vilspa.esa.es/calibration/documentation/epic_cal_meetings/200711/mkirsch_opsaction.pdf
Дата изменения: Tue May 13 17:50:55 2014
Дата индексирования: Wed Apr 13 13:34:58 2016
Кодировка:

Поисковые слова: viking 2
OPS action items
· EPIC TTD-0017/1: EPIC instrument knowledge and onboard S/W knowledge in combination with interface at ESAC needs to be maintained. Propose a back-up solution regarding retirement of E. Kendziorra and A Abbey in the not too distant future. Actionee: S. Sembay and U. Briel. EPIC TT-0017/2 Lela should be checked regarding radiation monitoring; a test version should be provided for ESAC and the PI institutes. Actionee: M. Kirsch

·

done

·

EPIC TTD-0017/3: Check the spare chain status: done, spare chain WG in place 1. check status of ISU --> ISU working 2. if ok, go ahead with implementation of SCOS2000 (will need H/W and S/W changes) 3. confirm if SCOS2000 support is going to be provided by ESA Actionee: G. Villa.
EPIC-TTD-15/3: Subsequently to evaluate and decide which of the items resulting from action 15/2 can be delivered

·

Marcus G. F. Kirsch
XMM-Newton Page 1


CAL action items
· AI_EPIC_CAL_18_01: done Contact Andra Tiengo and arrange integration into EPIC cal and task responsibilities (SS/MK) · AI_EPIC_CAL_18_02: done Review CALCLOSED/CLOSED observation strategy (MK) done · AI_EPIC_CAL_18_03: Comment on ESAC proposal for Flare screening (AI_EPIC_CAL_17_05) (HB/UGB) · AI_EPIC_CAL_17_03: MK, MM to test FIFO reset correction · AI_EPIC_CAL_17_08: SS to calibrate Pattern 0 for 3x3 mode · AI_EPIC_CAL_16_05: Provide estimate for the need of additional MOS CLOSED done observations (SSn) · AI_EPIC_CAL_14_1: Additional time column with other 0 point for OHL (RD, MK, MJF) · AI_EPIC_CAL_14_3: MK to implement time jump in a Qcheck type procedure in the long term

done

Marcus G. F. Kirsch
XMM-Newton Page 2


CALCLOSED/CLOSED observation strategy

pn MOS

· · ·

reasonable calclosed will reach by 2015 100% of EPIC cal budget MOS slew calclosed will as of 2010 provide too big merge range >100 Proposal: do 1 good calclosed per year
­ ­ ­ ­ ­ 2008: 150 ks 2009: 200 ks 2010: 250 ks 2011: 300 ks 2012: 350 ks
Marcus G. F. Kirsch
XMM-Newton Page 3