University of Leicester
X­rayAstronomy Group
'
&
$
%
MOS Bad Pixels V.2
x Tables V.2 were uploaded on 25 May
x These were calculated from all cal. source data up to Orbit 49
x The cancellation is functioning correctly
For pixel tables V.3
x Eight defects were missed from the V.2 tables of MOS­2
x At least three new defects have occurred up to orbit 90
x I will include fewer of the lowest level recurring pixels in V.3, as requested
EPIC CDAT Meeting Paris, June 2000
1

University of Leicester
X­rayAstronomy Group
'
&
$
%
CCD Damage Status
EMCS­1, CCD­1
x Considering only changes in CTI parallel
, measured in the Mn­K line (5899­eV)
x The SAS should currently correct for a ``loss­at­launch'' of 0.0050­adc/transfer
x The trend above represents an additional 0.0008­adc/transfer loss per month
x Day 1, the loss on transfer from FOV centre should be (300 \Theta 0.0050) = 1.5­adc
x Day 200, the loss on transfer from FOV centre will be (300 \Theta 0.0102) = 3.1­adc
EPIC CDAT Meeting Paris, June 2000
2

University of Leicester
X­rayAstronomy Group
'
&
$
%
CCD Damage Status
EMCS­2, CCD­1
x Considering only changes in CTI parallel
, measured in the Mn­K line (5899­eV)
x The SAS should currently correct for a ``loss­at­launch'' of 0.0040­adc/transfer
x The trend above represents an additional 0.0006­adc/transfer loss per month
x Day 1, the loss on transfer from FOV centre should be (300 \Theta 0.0040) = 1.2­adc
x Day 200, the loss on transfer from FOV centre will be (300 \Theta 0.0079) = 2.4­adc
EPIC CDAT Meeting Paris, June 2000
3

University of Leicester
X­rayAstronomy Group
'
&
$
%
Conclusion
x We ought to be able to measure perceivable shifts in the Mn­line position.
x The rate of change of damage may be different between cameras.
x By the time of Day 200, EMCS­1 CCD­1 ought to be experiencing 2­adc shifts.
x This is almost twice the last prediction of 1­adc in 220 days (D.Lumb email)
x We need to follow this with updated predictions of the resolution degradation.