Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/spst/lrpg/documentation/unix_migration/mupid/task-baselinecontrol.html
Дата изменения: Mon Jul 16 23:54:34 2001
Дата индексирования: Sun Mar 2 17:21:39 2014
Кодировка:

Поисковые слова: п п п п п п п п п п п п п п п п
Baseline Control Tools Requirements Page

Task: Baseline Control Tools Requirements


Overview:

The purpose of these tools is to provide a control mechanism for flagging an LRP as baselined in ASSIST..

Background documentation:

Below is a set of viewgraphs presented by Tricia Royle in April/May 2000 which cover the essential features of how and why an LRP gets baselined.

  • Viewgraphs on Current Baselining Procedure.

  • Viewgraph on Desired Baselining Procedure.

    Requirements:

  • Outline of New Baseline Tool Requirements (Investigated and documented by Tony Roman)

    Below is a viewgraph (created by . . . who? Beth? Tricia? Bill W.?) which detail what notifications need to be sent to the LRPG account when a calendar is baselined.

  • Viewgraph on LRP Baseline notifications.

    Below is a viewgraph (same author as previous viewgraphs?) detailing what notification needs to be sent to the PCs when the LRP is baselined.

  • Viewgraph on the baseline mail to the PCs.

    Below is a viewgraph (same author as previous viewgraph) detailing what notification needs to be sent to the LRPG on a daily basis.

  • Viewgraph on the daily mail to the LRPG.

    Task Status:

    Coding can begin at any time. It may be necessary to install dummy plugins in some sections until the operational prerequisites outlined in the requirements section are fulfilled.