Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/spst/lrpg/opm-012103.cov
Дата изменения: Fri Jan 24 17:31:10 2003
Дата индексирования: Sat Mar 1 07:34:23 2014
Кодировка:

Поисковые слова: arp 220
OPM Status Report for January 21, 2003:
Current Calendar Week Summaries:
03013: Last week's executed calendar:
Supervisor: Bower
Operations/Science Schedule Highlights:
o Efficiency: 46.29%

o Calendar rework on Finals week to add 7 orbits from activation of
Target of Opp 9352 based on GOODS North Epoch #2 (9583) on 02364.

Relevant Flight anomalies/HSTARS:
o 8900 - 03.016:04:57 - NICMOS Det 2 Analog Return Current Out of Limit
- 1 sample, returned to normal, no executing NICMOS obs
o 8901 - 03.016:09:04 - FGS Motor Encoder Temperature Out of Limit
- No losses of Lock
o Several FGS loss of locks

03020: Currently executing calendar:
Supervisor: MacConnell
Operations/Science Schedule Highlights:
o Efficiency: 51.19%

o non-standard calendar end = 2003.025:23 to accomodate time
critical scheduling on 2003.026.

Relevant Flight anomalies/HSTARS:
o None.

03025: Last built calendar:
Supervisor: Hathaway
Operations/Science Schedule Highlights:
o Available for calendar building Visits Orbits:
FltRdy/OpenPWs for the 2003.027: 77/ 78, 169/170
o Efficiency: 45.96%

o non-standard Calendar start: 2003.025:23
o non standard calendar end: 2003.033:15
o fully subscribed with extremely time critical programs:
o Large Program 9433 Kuiper Belt Survey
o Venus (0865901)
o pre-FRR Friday January 17, 2003 10:00, LMB 229
o FRR Tuesday January 21, 2003 09:30 NASA Bldg 3 Rm S107A
o Both FRR's will be teleconferenced to Rm 112
o Calendar builders should follow LRP template calendar which
will be identified in LRP notification.

* Record data volume recorded/dumped: 180.71/185.35 (GBits)
* Orbit statistics:
Prime earth Parallels
SI SCI+CAL Snaps flat Coord Pure Int CCD/MAMA/Both
-------------------------------------------------------------------
WFPC 0 0 3 7 45 28
STIS 3 2 0 74 28 0 / 2 / 1
NICMOS 0 2 0 22 3
ACS 86 3 0 0 2 25 86 / 0 / 0
FGS 2 0 0 0 0
-------------------------------------------------------------------
Totals 91 7 3 7 143 84

03033: Next building Calendar
Supervisor: Adler
Operations/Science Schedule Highlights:
o Available for calendar building Visits Orbits:
FltRdy/OpenPWs for the 2003.033: 80/ 85, 169/178

o non-standard Calendar start: 2003.033:15
o "standard" calendar end: 2003.041:00
o completion of 9433 - Kuiper Belt observations
o GOODS South Epoch #5 (9425)
o Calendar builders should follow template calendar which
will be identified in LRP notification.

Operations status/events:
Computer Systems:
o TBD - 24 hr downtime for SOGS downtime for disk management
o March 7, 2003 - ?? hr downtime for Sybase upgrade on HAL9000 and LAL

Proposal implementation:
o ?

LRP:
o ?

Scheduling:
o mid February (03048 or 03055) - FGS bright/dark earth limb calibration
- result may be to reduce limb avoidance angles
o Process problem during 03025 calendar build being investigated by Bill
Hathaway:
Not all required ACS darks were selected for scheduling. Probably a tool
deficiency with non-standard calendar boundaries.

PDB:
o Thursday Jan 16. - Updated earth/moon mass/radius value changes installed
in SPSS.

Flight Ops/Goddard:
o Two events affected flight ops connectivity on Saturday Jan 11.
o 03.011:16:50 - Prime T1 line outage - swtiched to backup line.
attempts to reconnect to prime have been unsuccessful
o 03.011:17:10 - Primary ATM switch failure - HSTAR 8895 -
All(?) strings offline for ~15 minutes

Operations analysis projects status:
o Data Volume working groups - Alan Patterson
o ACS large parallel scheduling - Calendar builders/George Chapman
o STIS/MAMA SNAP scheduling - Bill Hathaway
o SMS/PASS GUI - Don Chance, Greg Wenzel, Kerry Clark

Orbit Planning/Implementation Statistics:
o Orbit Summary:
o 1885 GO/GTO/CAL orbits in the LRP with plan windows
11 are Cycle 9
229 are Cycle 10
1645 are Cycle 11
o 126 GO/GTO/CAL orbits in the LRP without plan windows
4 are Ready and schedulable
39 are Ready but not schedulable
50 are Not Ready but schedulable
19 are Not Ready and not schedulable
5 are Not Ready with processing errors
9 are Not LRP candidates
o 21 GO/GTO/CAL orbits not in the LRP
3 are LRP Ready
18 are Not LRP Ready

o 377 Cycle 10 ToO orbits allocated
o 331 Cycle 10 ToO orbits scheduled
o 443 Cycle 11 ToO orbits allocated
o 124 Cycle 11 ToO orbits scheduled
o 10 ToO orbits in the LRP with plan windows
10 are Cycle 11
o 297 ToO orbits in the LRP without plan windows
7 are Ready and schedulable
5 are Ready but not schedulable
75 are Ready with processing errors
4 are Not Ready but schedulable
206 are Not LRP candidates
o 198 ToO orbits not in the LRP
1 are Not LRP Ready
197 are Not LRP candidates