SPST Shift Summary
12-Feb-2014 Day 043
** Day Shift **


Personnel: Hathaway, Bower

Shift Checkout by:

System Status:
Diskspace: DATA: @62% TREE: @62% PREP: @62% MS: @62%

Calendars in progress: 14048

SMS status:

Ephemeris Processing:

Shortfall Numbers:
Week: 14055 Total: 20 TDE: TDW: 6 171: TDS: 14 - WHH

FLIGHT:
14048:
from Bower -
o Sent the replaces. However, the send_sars_for_snas3 never finished.
It was apparently hung up waiting for one confirmation. Generated a
new tdrs schedule. Check_snas_replaces is OK.

o MS: 589 (1 replace). CL: load check errors.

o Sent the replaces. Generated a new tdrs schedule. Check_snas_replaces
is OK.

o MS: 589 (1 replace).

o That's the same replace that I sent before. I found the confirmation
was missing, so I called the NCC to send it again. Then, schedman
wouldn't configure the schedule. I found that the tdrs event was marked
'Granted' twice. So Alan helped figure out what was going on; so
I called the NCC who send the delete again for the oldest replaced
event out of the two 'Granted' ones.

o Generated a new tdrs schedule.

o MS: clean. CL: clean.

o MATLEI. 88 deletes out of 201 original. Sent.
Generated a new tdrs schedule. Ground station update is in.
Check_snas_replaces is OK.

o MS: clean. CL: clean.
Volume plots are technically acceptable. Bill and Merle came up
with text for the delivery notes regarding the partial engineering
dump on day 050.

o Delivered. Completed last steps.

o Sigh. Let it snow.


14055:
from Hathaway -

o Just to beat the snow, started looking at the 14055.
Did the usual LRP pull. In the morning, two visits were at imp,
1328660 and 13328G3. We know that 60 will go right after
1328659 so there is/will be a place for it when fully ready.

o Found a rough time for the WFC3 Anneal - days 57/58. After
moving MAINs around in that vicinity, settled on 057:12 to 058:12.

o Put the series 1333024-30 on, one each day. Slid those around
to best fit nearby visits before and after. At least some if not
all of them block visits adding in front of them once they're on.
So - add and confirm they each and all can get on, then take
them off, fill in around and re-add. Will be an on-going strategy.

o Checked that the first visit on day 055 does have gyro bias so
that the end of 048 bias is followed soon by an update.
It is 1329504. Followed by 1362351 and 52.

o Back-to-back 1346305-08 - first of set needs to be in a short
duration so they all get on - from 058:22 to 059:04

o Associated pair 1331601 and 1340301 are adjacent - only places for
them, but they both overlight. PC aware of these.

o Made a strawman calendar that should keep until Friday assuming
no office on Thursday. If I keep power and internet at home I
can practice building and improvement after noon tomorrow.
I do expect to be in on Monday and save my holiday for good
weather.

o Determined that the series of 13581 earth cals will schedule.
Some get overlit.

o Saved all so far to 140557v1x. Checked Guide Stars - dss looks
reasonable though we'll have fresher calendar later.

o Finished a SNAPs run. Will save away the info for later use.

o Did NOT baseline a calendar - couldn't be used overnight with
the database work anyway.


BUGS ENCOUNTERED:

MISCELLANEOUS: ********************************************************************************
NO swing shift report!