Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/sms-deliv/1999359-151450-smssa36.text
Дата изменения: Sat Dec 25 18:15:03 1999
Дата индексирования: Fri Feb 28 16:40:37 2014
Кодировка:

Поисковые слова: arp 220

To : Distribution
From : Science Planning and Scheduling Team, STScI
Date : 25-Dec-1999 15:09:45 UT
SMS Supervisor : ??? ??? ??? ???

Subject : SMS SA360J02: distribution of final products


The Mission Scheduler and Command Loader processing for the final run
of SMS SA360J02 has been completed. The products have been reviewed
and approved for release and may be found at address SSSP.GSFC.NASA.GOV,
while comments on the PASS errors are included below. This distribution
includes MEGG and MOSR products in addition to MS/CL products.

SMS Name : SA360J02
MS Run Name : SA360J02_F
CL Run Names : SA360J02_F1
Calendar Name : 993602P2
SMS Start Time : 1999.360:15:00:00
SMS End Time : 1999.361:12:00:00


PRS:
====
Operational Period Catalogs and SPCs have been generated from the Command
Loads. The OPCats are:

HOMER::PASSOPS:[OPC.CATALOGS]OP3591441.CAT;1

CCS:
====
Product Notification Message PNM_1999359150818.TXT fully enumerating
these products has been successfully transmitted via File Transport
Protocol (FTP) to the Control Center System (CCS) A, B, and G strings.



PASS error analysis
===================

There are no mission scheduler errors of note.

The are two 1650/03 (NO UPLINK OPPORTUNITIES FOR THIS LOAD)
command loader errors. The loads involved are listed below.
These loads are at the very beginning of the SMS where there
is no service.
Please examine the errors/loads for resolution.

DF-224 TCP LOAD: Q02Z7210A
LOAD SIZE: 000005 BLOCKS
ESTDUR: 2.93 MINUTES
LOAD AFTER: 99.360 14:59:59
LOAD BY: 99.360 15:17:46

NSSC-1 ATP LOAD: N02Z7210A
LOAD SIZE: 000003 BLOCKS
ESTDUR: 2.65 MINUTES
LOAD AFTER: 99.360 15:02:04
LOAD BY: 99.360 15:17:50


HST FINAL MODE LOAD APPROVAL FORM
=================================


SUBSYSTEM SIGN-OFF (ENTER NAME) DOY/TIME
--------- --------------------------- --------

DMS FC/SE
--------------------------- --------
EPS FC/SE
--------------------------- --------
I&C FC/SE
--------------------------- --------
OTA FC/SE
--------------------------- --------
PCS FC/SE
--------------------------- --------
SI FC/SE
--------------------------- --------
MPO FC/SE
--------------------------- --------
STSCI/SPST Merle Reinhart 359/15:12
--------------------------- --------

=======================================================================
FINAL AUTHORIZATION:


-------------------------------------------- -------------
MOSES FO MANAGER/MOSES SS APPROVAL TO UPLINK DOY/GMT

=======================================================================



Delivery Notes:
===============

This is a Health & Safety SMS assuming a COLD START condition.
This SMS assumes that the 486 and FGS2R are onboard.

Various permanent resident standard RTCS's are loaded within this SMS.
Please note that the default K-factor guiding values are reloaded at the
end of the SMS including the best current estimates for FGS2R's KZ and KB.

The assumed vehicle attitude and SA positions at the start of this SMS are:
RA = 217.4
Dec = +51.8
Roll = 230.0
SA = 90.0


Two ETR dumps have been merged into this SMS via DMS360.SMS.
They are for the purpose of clearing the Engineering Recorder prior to proposal
08521 (FGS02 - Guide Star Acquisition Test) which executes early in the
follow-on SMOV science SMS.



Ancillary information and reports:
==================================


The following proposals are scheduled on this SMS:

HS123 PROPOSAL TO DO 2-FHST MAPS
POINT SPSS GENERIC POINTING PROPOSAL
TABLE MISCELLEANEOUS SI TABLE LOADS (SPSS)




SOLAR ARRAY OPTIMIZATION SUMMARY REPORT
1999.359 14:20:13 VERSION= 2.4


Command: SMSG/EPS_MERGE/INITIAL_SAANG=90.0 993602P2

CALENDAR START= 1999.360:15:00:00 CALENDAR END= 1999.361:12:00:00

CALENDAR ID= 993602P2

NUMBER OF SA SLEWS= 0

SA COMMAND TIME +V1/SA-NORMAL SA_SLEW_DUR SA_SLEW_ANG
yyyy.ddd:hh:mm:ss (DEG) (SEC) (DEG)
----------------- ------ ----- ------





LEGEND:
Col 1 (SA COMMAND TIME) The time of the SASLWLIM EPS SMS statement.

Col 2 (+V1/SA-NORMAL) The angle between the V1 axis and the SA normal
vector, measured clockwise from V1 in the same
direction as the Sun, in degrees.
This is the EPS SMS SA angle following the SA slew.

Col 3 (SA_SLEW_DUR) The solar array slew duration, in seconds.

Col 4 (SA_SLEW_ANG) The solar array slew angle, in degrees:



Slew summary of Calendar 993602P2

Start Stop V1-SUN
ddd:hh:mm:ss ddd:hh:mm:ss RA DEC PA OR Angle

360:15:10:15 361:11:18:45 217 52 130 1 90
361:11:18:45 361:11:35:04 217 52 130 1 91






Note: The following gaps of more than 4 hours
between activities exist on this Calendar:

Separation Time Activity Next Activity Al after Gap
(ddd:hh:mm) (ddd:hh:mm) (ddd:hh:mm)

000:19:59 360:15:21 361:11:20 POINT:HF:01



COMCON Block Summary
SMS FILE NAME: SPSS_SMS:993602P2.SMS
Calendar FILE NAME: SPSS_DATA_DK2:[PLANINST.PASS.993602P2]993602P2.CAL


Start Time End Time Duration Service T H Rate Prop Prg Ob Al Vn
------------ ------------ ----- ------- - - --- ------------------



Distance between target and 1-star acq guide star
SMS FILE NAME: SPSS_SMS:993602P2.SMS

LABELS: START TIMES: DELTA PRI TAR RA/ TAR DEC/ TARGET
SLEW/ SI GSACQ/ TIME FGS GS RA GS DEC DIST
GSACQ NAME NEXT SLEW (SEC) (DEG) (DEG) (AMIN)
-------- ---- ----------------- ------- --- -------- -------- ------