Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/sms-deliv/1997052-190953-SMSSB05.text
Дата изменения: Mon Apr 26 17:18:34 1999
Дата индексирования: Fri Feb 28 16:31:00 2014
Кодировка:

Поисковые слова: virgo cluster

To : Distribution
From : Science Planning and Scheduling Team, STScI
Date : 21-FEB-1997 16:43:46 UT
SMS Supervisor : Merle Reinhart, 410-338-4496

Subject : SMS SB055H02: distribution of final products


The Mission Scheduler and Command Loader processing for the final run
of SMS SB055H02 has been completed. The products have been reviewed
and approved for release and may be found at address SSSP.GSFC.NASA.GOV,
while comments on the PASS errors are included below. This distribution
includes MEGG and MOSR products in addition to MS/CL products.

SMS Name : SB055H02
MS Run Name : SB055H02_FB
CL Run Names : SB055H02_FB1
Calendar Name : 970553E1
SMS Start Time : 1997.055:00:00:00
SMS End Time : 1997.058:00:00:00

Operational Period Catalogs and SPCs have been generated from the Command
Loads. The OPCats are:

HOMER::PASSOPS:[OPC.CATALOGS]OP0521632.CAT;1



PASS error analysis
===================

With this SMS, the management of the engineering tape recorder was changed to
Continuous Engineering Mode.

-------------------------------------------------------------------------------

The following errors are noted:

0*** 1655/02 CSHUPDHST 4
*** THE LOAD N11B2870A ESTIMATED UPLINK DURATION TIME ( 14.71 MIN.)
*** EXCEEDS THE UPLINK OPPORTUNITY DURATION TIME ( 11.00 MIN.):
*** 97.054 19:06:00 97.054 19:17:00 0286 B7054083 TDW

This error is for the small NSSC-1 load N20B3310A...
0*** 1654/03 CSHSELECT 1
*** THE UPLINK OPPORTUNITIES FOR THIS LOAD = 2, BUT 4
*** WERE DESIRED.

This error is for the small DF-224 load D09B3310A...
0*** 1654/03 CSHSELECT 1
*** THE UPLINK OPPORTUNITIES FOR THIS LOAD = 2, BUT 4
*** WERE DESIRED.

-------------------------------------------------------------------------------

HST FINAL MODE LOAD APPROVAL FORM
=================================


SUBSYSTEM SIGN-OFF (ENTER NAME) DOY/TIME
--------- --------------------------- --------

DMS FC/SE
--------------------------- --------
EPS FC/SE
--------------------------- --------
I&C FC/SE
--------------------------- --------
OTA FC/SE
--------------------------- --------
PCS FC/SE
--------------------------- --------
SI FC/SE
--------------------------- --------
MPO FC/SE
--------------------------- --------
STSCI/SPST Merle Reinhart 052/16:55
--------------------------- --------

=======================================================================
FINAL AUTHORIZATION:


-------------------------------------------- -------------
MOSES FO MANAGER/MOSES SS APPROVAL TO UPLINK DOY/GMT

=======================================================================



Delivery Notes:
===============

Please note that the SSR dumps that start at 055:02:00:00,
055:04:00:00, 056:16:25:00 and 056:20:48:00 are important in that they
contain WFPC2 data that is needed on the ground quickly.


*********************
* FOC F48 Turn on *
*********************

In addition to the SMOV proposals for WFPC2 and NICMOS, this SMS
contains the periodic activation of the FOC F48 detector.

*********************************
* Realtime Commanding Support *
*********************************

STIS CCD TEC temperature setting

On day 054 16:47:00, we modified the CCD TEC setpoint to a value
of 40 (= -83 degC). We will closely monitor the TEC temps
after this, and if they are not "well behaved" we may require a
realtime adjustment or a realtime TEC turnoff. The OPS request
will originate from the Institute. We understand that COP 18.17
already exists to handle this contingency.


**************************************
* Non-standard SI reconfigurations *
**************************************

The STIS continues throughout this SMS in its non-standard
operate state with the CCD detector flushing and the MAMA detector
power supplies on.

After executing another set of contamination monitoring
observations, the WFPC2 will be transitioned into a non-standard
decon state. The TECs will be off, the CCD heater and heatpipe
heater will be on, the shutter will be closed and the F785LP filter
will be in the beam. We exit the SMS in this state.





Ancillary information and reports:
==================================


The following proposals are scheduled on this SMS:

05582 FOC/48 MONTHLY ACTIVATION (CAMERA SECTION ONLY)- CYCLE 4
07016 WFPC2 SM97 UV MONITOR AND COOL DOWN PROCEDURE
07037 NICMOS Transfer Function Verification Test
07136 NICMOS Internal Parallel (Electrical Cross Talk) Test - Part 2
POINT SPSS GENERIC POINTING PROPOSAL
TABLE MISCELLEANEOUS SI TABLE LOADS (SPSS)





SOLAR ARRAY OPTIMIZATION SUMMARY REPORT
97.051 01:31:59 VERSION= 1.00


CALENDAR START= 1997.055:00:00:00 CALENDAR END= 1997.058:00:00:00

CALENDAR ID= 970553E1

NUMBER OF SA SLEWS= 1

SA COMMAND TIME +V1/SA-NORMAL SA_SLEW_DUR SA_SLEW_ANG
yyyy.ddd:hh:mm:ss (DEG) (SEC) (DEG)
----------------- ------ ----- ------
1997.055:10:38:24 80.00 159. 5.96



Slew summary of Calendar 970553E1

Start Stop V1-SUN
ddd:hh:mm:ss ddd:hh:mm:ss RA DEC PA OR Angle

055:10:38:24 055:23:35:12 127 -62 212 0 105
055:23:35:12 056:15:41:37 123 -62 216 0 104
056:15:41:37 057:23:35:02 48 -69 287 0 74






Note: The following gaps of more than 4 hours
between activities exist on this Calendar:

Separation Time Activity Next Activity Al after Gap
(ddd:hh:mm) (ddd:hh:mm) (ddd:hh:mm)

000:05:10 55:02:20 55:07:30 07136:01:01
000:04:20 55:13:10 55:17:30 07136:07:01
000:04:48 55:17:42 55:22:30 07136:10:01
000:07:18 56:02:42 56:10:00 07037:02:01
000:04:37 56:10:23 56:15:00 07136:16:01
001:03:35 56:19:55 57:23:30 RCF01:02:01



COMCON Block Summary
SMS FILE NAME: SPSS_SMS:970553E1.SMS
Calendar FILE NAME: SPSS_DATA_DK2:[PLANINST.PASS.970553E1]970553E1.CAL


Start Time End Time Duration Service T H Rate Prop Prg Ob Al Vn
------------ ------------ ----- ------- - - --- ------------------



Distance between target and 1-star acq guide star
SMS FILE NAME: SPSS_SMS:970553E1.SMS

LABELS: START TIMES: DELTA PRI TAR RA/ TAR DEC/ TARGET
SLEW/ SI GSACQ/ TIME FGS GS RA GS DEC DIST
GSACQ NAME NEXT SLEW (SEC) (DEG) (DEG) (AMIN)
-------- ---- ----------------- ------- --- -------- -------- ------
SMS008K WFII 1997.056:15:58:59 113778. 3 47.627 -68.602
SMS008N 1997.057:23:35:17 47.308 -68.757 11.6