SMOV STATUS & PLANNING MEETING - 7 APR. 97 NOTE: The next meeting is April 9, 8:30 AM. STATUS REPORTS 1. Observatory Status PCS reports three guide star problems over the weekend: 095/0640 - (7150 - NICMOS focus monitor) - default to single guide star 096/0421 - (7117 - NICMOS ERO) - default to single guide star 096/2224 - (6361 - WFPC2 snapshot) - drop to gyro control The NICMOS observations on single guidestars are not expected to be adversely affected. 2. WFPC2 Status - Proceeding nominally with Cycle 6 science and remaining SMOV monitors. 3. NICMOS Status - Engineering Status - At 095/0734, a Filter Wheel 2 "retry" was performed successfully. A real-time command to clear the error flag was later sent. There were no retries during this weekend's focus monitoring activities. Focus monitoring analysis is proceeding. At 095/1439, the NICMOS Dewar heaters suffered a another thermal set point corruption associated with and SAA passage, thereby allowing the heaters to come on. At 1609, the set point was commanded back to the appropriate value. The Detector temperature is 60.977 degK. The VCS temperature is 97.807 degK. - Science Status - 7150 Focus monitor data are being analyzed. EROs 7116 (Arp220) and 7117 (M16) have been observed and data are received. Analysis is only just starting, so there was nothing specific to report. 4. STIS Status - Engineering Status - Nominal. - Science Status - Nominal. ERO analysis is proceeding. The 7067 CCD target acquisition test (3rd iteration) was performed last evening and was apparently successful. 5. FGS status - The FGS-1R guide star acquisition test (7030) is proceeding nominally. At the time of the meeting, three of the four acquisitions have succeeded. K-factors and PDB update are being worked for the SMS111. 6. FOC/COSTAR status- The FOC SMOV program has been reported to the SMOV TTRB as complete. The SMOV TTRB has enabled the resumption of FOC science. PLANNING REPORTS 1. Status of Upcoming SMSs - SMS097 - Currenly executing. - SMS104 - Final Mode products are expected to be available later today. Gaps for FSW configuration opportunities related to MAMA SAA-avoidance management are on days 105 and 110. - The CCD annealing proposal (7107) goes in this SMS. - A PDB update involving the downlink transmission delay parameter is in the hands of the PDB office, which apparently is awaiting freeze board approval of the change. - SMS111 - Currently being built. The current plan is to include the MAMA turn-on (7105 revised) in this SMS. - SMS118 - Construction to start later today. May include some of the later stages of the MAMA turn on sequence (7105). 2. Replans STIS - MAMA HV Turn-on (7105) is currently planned for SMS111. Downstream MAMA scheduling is being assessed. NICMOS - No significant replans have yet been identified. OPERATIONS STATUS 1. OPUS - Some obsets of the NICMOS ERO 7117 are pending in the pipeline, because the data was dumped to the recorder in 2 separate pieces, which causes OPUS processing problems. Manual workarounds are being pursued. 2. Archive - Nominal.
Go back to the Meeting Minutes Page