Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.stsci.edu/smov/notes/0312smov.html
Дата изменения: Fri Mar 14 23:36:23 1997 Дата индексирования: Thu Feb 27 23:55:08 2014 Кодировка: Поисковые слова: apollo 13 |
NOTE: THE NEXT MEETING IS FRIDAY, MARCH 14, 8:30 AM. STATUS REPORTS 1. Observatory Status MOSES PCS reports: - 7026 - The FGS-1R FF3 Optimization Activity is proceeding nominally. (Hand-out materials available). Preliminary analysis of full-aperture scans look within expectations and predictions for 2/3 aperture are very good. (Details in the hand-out). Plans are to complete analysis, determine optimal AMA move (Preliminary estimates are - 4 steps in X and 4 or 8 steps in Y.), and perform the moves and "5-points-of-light" in upcoming SMSs (076 - 083) 2. WFPC2 Status - Proceeding nominally with Cycle 6 science and remaining SMOV monitors. 3. NICMOS Status - Engineering status - The Cold Well temperature is still ~59 degK and the rate of increase is still ~0.15 deg/day. The VCS temperature is now 110 degK and the rate of cooling is now -3.6 deg/day (down from -5.5 reported yesterday). - Science Status - The Coarse Alignment activity (7041) is proceeding nominally. The Camer 1 focus sweep looks good. The Camera 3 focus position should be established this week. The instrument will be returned to BOOT mode following today's alignment activities. 4. STIS Status - Engineering Status - Mike Hinds reports that no CCD resets have yet to be observed. - Science Status - Flat field analyses are on-going, currently with a 0.5% standard deviation. The thermal stability of slit/detector plane is better than expected, although large temperature extremes have not yet been experienced. The hot- pixel table is being worked, as is the modification to pro- posal 7107 to accomplish annealing of hot pixels. The UV sensitivities (7063 UV Monitor) look good; the orbit/ground ratios are 1.05 - 1.1 for the "red" bands, and 1 - 0.8 in the G230LB. 5. FGS status - See no new activity. The FF3 Optimization Activity (7026) in this SMS have begun, with the 3 visits scheduled today and tomorrow. (See the Observatory/PCS status report above.) 6. FOC/COSTAR status- no new activity PLANNING REPORTS 1. Status of Upcoming SMSs - SMS069 - Currently executing. - SMS072 - Signed off. - SMS076 - Final Mode products are out for review. - SMS079 - Built and under internal review. - SMS083 - Initial Mode products are out for review. This SMS implements the SSR for engineering data record. - SMS090 - Initial calendar build has begun. A splinter was held after yesterday's meeting to validate plans for STIS trg acq testing in this SMS. The meeting resulted in some minor changes to the scheduling of each visit of Proposal 7067 and a plan to provide table updates in time for each visit. 2. Replans - Because inefficiencies involved in SAA avoidance, the NICMOS Limb Avoidance Test (7053) had to be moved out of the SMS083 into a later one in order to preserve the NICMOS ERO scheduling. - MAMA HV Turn-on (7105) is delayed (from 21 March) indefinitely. Affects on downstream MAMA scheduling will be assessed. OPERATIONS STATUS 1. OPUS - Nominal. 2. Archive - Nominal.
Go back to the Meeting Minutes Page