Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.stsci.edu/smov/notes/0223smov.html
Дата изменения: Tue Mar 11 23:58:55 1997 Дата индексирования: Thu Feb 27 23:53:55 2014 Кодировка: Поисковые слова: heart nebula |
STATUS REPORTS 1. Observatory Status MOSES status reports: -PCS - nominal - Proposal 7028 executed successfully, returning HST to fine-lock guiding (FGS 2&3) ` -EPS - nominal - SADE timing will continue to be monitored. -DMS - nominal - SSR is currently continuously recording engineering data (SMS053). -Thermal - nominal. -FSW - STIS 4.5 patch installation was carried out. (Hand-out provided by SI/MOSES.) STIS was returned to HOLD mode to await SMS reconfiguration. Post-installation EEPROM memory dump was verified by BRZ updated to match on-orbit SI configuration. 2. WFPC2 Status - nominal - successfully transitioned from SAFE to HOLD. CCDs at +22C. AFMs at -43C. 3. NICMOS Status - During execution of proposal 7033, two status buffer messages were issued due to an improperly commanded NICMOS memory monitor word during the memory self test. The second was due to a memory dump time-out because of improper SDF conditioning by the SMS commands for dumping. (Details in hand-outs provided by both STScI and MOSES.) The NICMOS EEPROM and CS buffer memory were dumped successfully in real-time. Now nominal. 4. STIS Status - During proposal 7058 (STIS Memory Load & Dump), the instrument suspended, reporting two status buffe messages. Both were related to the attempt to invoke an OPERATE-mode macro while in BOOT mode. The SI was recovered by PSTOL commands. (Details in a MOSES-provided hand-out.) Now nominal, although the IDT reports that 28-volt noise problem has reappeared without any reconfiguration of FOC/PDU (See notes from 22 Feb meeting.) Believed to be understood as some sort of amplification effect. 5. FGS status - nominal - no change from last report 6. FOC/COSTAR status - COSTAR DOB was successfully deployed, but not before a safing event caused by a mis-match between actual start position and the position expected by new NSSC1 FSW. (Details in STScI-provided handout.) PLANNING REPORTS 1. Status of Upcoming SMSs - SMS053 (1st SMOV Science SMS) - Uplinked and executing. The goal is to run all of the SMSs through SMS069 by Sunday for input to commanding review in order to get a jump on TDRS requests in forecast period. - SMS055 - Signed off. Ready for uplink. - SMS058 - Has beem built and finals have been delivered for review. - SMS058H - (contingency SMS058 in case WFPC2 contamination is seen in SMS055) - Has beem built and finals have been delivered for review. - SMS062 - built and under commanding review. TDRSS requests being negotiated Monday morning during Active Period. - SMS065 - built and under commanding review. TDRSS requests being negotiated Monday morning. - SMS069 - built and under commanding review. TDRSS requests being negotiated Monday morning prior to forecast period. - SMS072 - currently being built, expected tonight for initial SARs. 2. Replans - none OPERATIONAL ISSUES - As a result of the STIS and NICMOS operational problems reported above, John Campbell requests a list from the STScI of all SMOV proposals using special commanding and requests a furhter review, on the part of the teams, of the upcoming activities in the current and next SMSs.
Go back to the Meeting Minutes Page