Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.stsci.edu/smov/notes/0227smov.html
Дата изменения: Tue Mar 11 23:59:06 1997 Дата индексирования: Thu Feb 27 23:54:13 2014 Кодировка: Поисковые слова: mimas |
STATUS REPORTS 1. Observatory Status MOSES status reports: -PCS - nominal -OTA - nominal -EPS - nominal -DMS - nominal - SSR testing, including SAA behavior, continues in data gathering mode with recurrence of now typical re-tries. -Thermal - nominal. 2. WFPC2 Status - nominal - CCD temperature now at -88C - Today's UV monitor's at this temperature will be used to decide whether or not to remain at the operational -88C. A decision is expected at around 10 pm tonight. 3. NICMOS Status - nominal The cold well temp is at 56K and levelling off. VCS temperature is within the expected range. NICMOS science is in the process of analyzing data from recent internal tests. (Note: Since this meeting, NICMOS went into suspend with a Detector 1 VD voltage out of limits low. Reason unknown, more details in tomorrow's meeting notes.) 4. STIS Status - CCD temperature is nominal -83 degC. MAMA low voltages were turned back on yesterday, and since that time another MCE reset, this time on MAMA1, has occurred, again in the SAA. The plan is to reset (or unreset) the affected parameters and keep running. (Note: Since this meeting, a third MCE reset (MAMA1) has occurred. More details in tomorrows notes and from the planned Project meeting this afternoon.) 5. FGS status - no report 6. FOC/COSTAR status - nominal. PLANNING REPORTS 1. Status of Upcoming SMSs - SMS058 - Currently executing. - SMS062 - signed off and ready for uplink. - SMS065 - finals are out for review - SMS069 - built and initials out for review - SMS072 - built and initials out for review - SMS076 - built - SMS079 - being worked 2. Replans - none OPERATIONS STATUS - 1. OPUS - OMS data is now being processed by through the pipeline. - A problem with the FITS I/O kernel for CALSTIS has been identified and a fix is expected for next week. In the meantime, any STIS science data that fails calibration will be FTP'd directly to the team without going through CALSTIS. 2. Archive - A problem with an OMS STSDAS task has been identified and is being worked.
Go back to the Meeting Minutes Page