SMOV Proposal Process
Initial Submission through Flight
George Chapman Merle Reinhart Tony Roman February 21, 2001
1


Overview
· · · · · Proposal Implementation Team (PIT) The PIT Process PIT Schedule The Proposal ­ Phase 2 Tips Beyond the PIT

2


Proposal Implementation Team (PIT)
· A group of experts that meet to develop and implement proposals fast, safely and efficiently · Compressed timeline for SMOV benefits from a focused group · Try to accomplish via one or two meetings per proposal (more if necessary)
3


The PIT Process
· Proposal Submission
­ best attempt at converting Activity Summary into a proposal ­ no later than deadline (earlier is better)

· Proposal Processing · PIT meeting #1
­ proposal reviewed in detail ­ modifications identified ­ special implementation needs identified

4


The PIT Process (cont'd)
· Modifications & Resubmission
­ no later than deadline (earlier is better)

· Proposal Processing · PIT meeting #2 (if needed)
­ verify expected modifications ­ final review of proposal and ancillary products ­ approval to process to flight ready state

· If necessary, PIT meeting #3
5


The PIT Schedule
Submission Deadline PIT Meeting #1 10+ working days

5 Working Days Resubmission Deadline PIT Meeting #2

5 Working Days
6


The Proposal ­ Phase 2 Tips
· Use Web version of proposal for any changes
­ http://www.stsci.edu/public/propinfo.html

· · · · ·

Good, Detailed Descriptions Include Related Activity Summary Ids Include prerequisite Proposal Ids Default for SMOV is SCHED 100% Absolute Time constraints should be used only for visits with alternate targets · SMOV3B is to be tagged as Cycle 10
7


The Proposal ­ Phase 2 tips (cont'd) Contingency Planning
· Each Phase 2 should allow for a launch shift of at least plus or minus 1 month · Use the ON HOLD special requirement on conditional visits

8


The Proposal ­ Phase 2 Tips (cont'd) Expedited Data Flow
· If data is needed in a timeline fashion for analysis, then this needs to be explicitly mentioned in the visit comments.
­ Data to the PI within 12 hours of visit completion. ­ Data to the PI within 20 hours of visit completion. ­ Data to the PI within 32 hours of visit completion.

· These numbers assume ~8 hours of processing after the data is downlinked from the spacecraft until the data is available to the PI.
9


The Expedited Dataflow
SSR Engineering Dump <1 hr. to <~12 hrs. Science RealTime PACOR-IN

Spacecraft
Science Dump <1hr. to <~12 hrs. PACOR-IN

CCS-IN

~2-4 hrs.

CCS

RealTime <<1 hr.

Quicklook <2 hrs.

Production <~4 hrs.

PACOR

CCS-OUT

PACOR-OUT OPUS-IN OPUS-IN <1 hr.

PACOR-OUT OPUS-IN ~1 hr.

PACOR-OUT OPUS-IN ~3 hrs.

24 48 hrs.

OPUS

OPUS-OUT

OPUS-OUT

OPUS-OUT

DADS-IN Extraction from Warehouse

FTP <1 hr.

FTP <1 hr.

FTP <1 hr.

<~1 hr.

DADS

STARVIEW

<1 hr.

SE

PI

10


Beyond the PIT
· Process proposal through flight ready · Schedule first 4-weeks of SMOV and provide products for review before launch
­ First 4-weeks flight ready by launch minus eight weeks ­ Representative calendars are built assuming a nominal launch date and without normal science visits (SMOV only) ­ Provides feedback into the overall SMOV Timeline ­ Provides necessary input for the LRP
11


Beyond the PIT (cont'd)
· After launch, the SMOV and Operational databases are merged and the LRP rebuilt · Visits are set flight ready during week T-5 · Appropriate flight calendar requirements are defined during week T-4 · Flight calendar building begins at week T-3 · Execution
12


Proposal Processing
· Notification of submission - verify this is what is expected · Preprocessor - checks for syntax errors and changes since last version, Assist Database is loaded · Trans/CASM - creates the structure within the visits and links between the visits · PMDB Load - loads the data into the Proposal Management DataBase

13


Proposal Processing (cont'd)
· Obset Update - computes and propagates pointing information and validates SI/SI detector state reqs · GS Request - searches for suitable guide stars · Visit Update - calculates windows and prepares the visit data for calendar construction · Spike - computes overall schedulability of the visits · PIT Galleyproof - email to PIT members indicating products ready for upcoming PIT meeting

14