Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.stsci.edu/smov/FGS/its_activity.htm
Дата изменения: Thu Jun 21 00:26:15 2001 Дата индексирования: Fri Feb 28 00:09:44 2014 Кодировка: Поисковые слова: reflection nebula |
![]() View in Powerpoint |
APPLICABLE SMOV REQUIREMENT: Check the FGS and ITS for variations in Test Source illumination and signal response.
DESCRIPTION: Check the FGS and ITS for variations in Test Source illumination and signal response.
IMPLEMENTATION METHOD: Performed using standard planned commands (Alan Welty/STScI has the SMS commanding to accomplish this activity). This activity must be performed in telemetry format 'F'.
DEPENDENCIES: Should be conducted before the first guide star acquisition. The FGE modifier (Kd) should be set to the baseline value of 0.013 for each FGS, before this activity is started.
DURATION: Approximately 6.0 minutes of commanding for each FGS, yields 18.0 minutes total.
DATA REQUIREMENTS: Approximately 18.0 minutes of standard engineering data in 'F' format.
ANALYSES & RESULTS: The data will be processed using existing software, the results will be trended with the pre-SM3B measurements. The final report will be available 2 weeks after the test.
COMMENTS: None
AUTHOR/telephone/email/DATE:
Art Bradley
(301) - 901 - 6052
abradley@hst.nasa.gov
3 January 2001
Phase
Two Proposals
SMOV
Proposal Implementation Schedule
SMOV
Activity-to-Proposal Correlation
STSCI Homepage
STSCI SM3 Homepage