Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/ops/swat/safing/96352/daily-12-18.txt
Дата изменения: Wed Dec 18 21:03:20 1996
Дата индексирования: Sun Mar 2 02:40:42 2014
Кодировка:

Поисковые слова: п п п п п п п п п
from the daily report

2.3 Operations Notes:

The health and safety SMS began execution at 353/0200Z. The loads =
have been produced for the return to normal science operations. These =
are scheduled for uplink this afternoon with execution to begin at =
353/2200Z.

As described in HSTAR 5850, both battery #2 and #3 exceeded their =
temperature limits. Battery #2 went to 5.12 degC, first breaking the =
limit at 352/233602Z. Battery #3 went to 5.34 degC, first breaking its =
limit at 353/000302Z. The reason(s) for these limit excursions are =
currently being investigated.