Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/itm/index.html
Дата изменения: Fri Aug 4 00:22:36 2000
Дата индексирования: Sat Mar 1 07:49:01 2014
Кодировка:
PRESTO Internal Technical Memoranda

ITMs

Internal Technical Memoranda

ITMs are technical reports available only within STScI.

The ITM template can be found by pressing the "NEW" button in Framemaker and looking in the Presto directory. These reports are edited and controlled by the PRESTO Project Scientist Group. Contact Dave Soderblom at drs@stsci.edu


1998

ITM-1998-01: "A New Series of Technical Documents: Internal Technical Memoranda (ITMs) and User Information Reports (UIRs)"

Abstract (html); Full Report (pdf)

ITM-1998-02: "Snapshot Scheduling"

Abstract (html); Full Report (pdf)

ITM-1998-03: "Optimizing Scheduling in a Two-Instrument Environment"

Abstract (html); Full Report (pdf)

ITM-1998-04: "Notes on v8.0.1 of the Phase II Proposal Instructions"

Abstract (html); Full Report (pdf)

ITM-1998-05: "The Short Term Scheduling Process in 1997"

Abstract (html); Full Report (pdf)

ITM-1998-06: "Policies for the Telescope Time Review Board (TTRB): Repeating HST Observations, Changes to Accepted HST Programs, Resolution of Duplications, and Other Program Alterations"

Abstract (html); Full Report (pdf)

ITM-1998-07: "Report of the STScI Focus Group on Program Preparation Process and Scheduling"

Abstract (html); Full Report (pdf)

ITM-1998-08: "HST Scheduling Policy after NICMOS end of science"

Abstract (html); Full Report (pdf)

ITM-1998-09: "Notes on v8.0.3 of the Phase II Proposal Instructions" (GO and ENG versions in pdf format)

Abstract (html); Full Report (pdf)

1999

ITM-1999-01: "Maintaining Scheduling Efficiency in a Two-Instrument Environment: Reducing the Competition for SAA-Free Orbits"

Abstract (html); Full Report (pdf)

ITM-1999-02: "Procedures for Developing Calibration Programs"

Abstract (html); Full Report (pdf)

ITM-1999-03: "A New Paradigm for User Support and Software Tools"

Abstract (html); Full Report (pdf)

ITM-1999-04: "Making SMOVs Easier: Proposal Changes to Minimize Special SQL"

Abstract (html); Full Report (pdf)

ITM-1999-05: "Procedures for Activating Targets of Opportunity"

html; pdf

ITM-1999-06: "APT: HST Proposal Preparation Environment for the Second Decade"

Abstract (html); Full Report (pdf)

ITM-1999-07: "Automation Cost Analysis of Rolling Between NICMOS Coronagraphy Observations in the Same Orbit"

Abstract (html); Full Report (pdf)

2000

ITM-2000-01: "High Data Volume SMSes and TDRS Contact Usage"

html; pdf

ITM-2000-02: "The Scheduling Process using Generic TDRS Requests"

html; pdf

new ITM-2000-03: "Scheduling SNAP Observations"

html; pdf

Last update on 08/03/00 by jyounger@stsci.edu