Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/hst/nicmos/documents/stan/stan_036
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 10:07:50 2016
Кодировка:

Поисковые слова: launch
NICMOS STScI Analysis Newsletter 36
STScI Logo

Hubble Space Telescope
NICMOS STScI Analysis Newsletter 36

+----------------------------------------------------------+
| NICMOS
| STScI Analysis Newsletter
| 05 February 2007
+----------------------------------------------------------+
Visit the NICMOS web site http://www.stsci.edu/hst/nicmos
"New in the Last 45 Days" for all new information about NICMOS.

CONTENTS:

-NICMOS Recovery and Return to Science

+----------------------------------------------------------+

NICMOS Recovery and Return to Science

NICMOS is recovered and back in normal operation following the safing
of HST on January 27, 2007. The NICMOS NCS cooldown was started on  
Monday
January 29 and proceeded nominally, with the instrument cooled down
and ready to begin initial operations by Friday February 2. The  
initial
checkout of all the electronic and mechanical systems of the  
instrument
showed nominal behaviour, including normal operation of the filter  
wheel
which was verified by examining the filter wheel motor currents as  
well
as inspection of flat fields taken through a range of different  
filters.
The count rates in the flat fields, as well as the bias and dark  
current
properties, show no significant change in any of the three cameras
compared with similar data obtained before the safing.

Overall, NICMOS appears to have settled down in a similar way to its
behavior after previous HST safing events, and no unusual problems
have been uncovered in any aspect of its operation so far. Science
programs have begun executing and preliminary results also reveal no
unexpected behavior so far. More detailed analysis of the calibration
data will continue as further data are obtained; if any changes are
found in the more detailed analysis then those will be accounted for
by delivering new reference files according to the usual procedure.
A more detailed report will be distributed later once analysis of all
the data has been completed.

For more detailed information and updates, please consult the
NICMOS webpages: http://www.stsci.edu/hst/nicmos/.


+----------------------------------------------------------+
| Help: help@stsci.edu
+----------------------------------------------------------+
| To subscribe or unsubscribe to the STAN, send a message
| to majordomo@stsci.edu with the subject line blank and
| the following in the body: [un]subscribe nicmos_news
+----------------------------------------------------------+
| The Space Telescope Science Institute is operated by the
| Association of Universities for Research in Astronomy,
| Inc., under NASA contract NAS5-26555.
+----------------------------------------------------------+