Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/ftp/instrument_news/FOS/postscript/tips_07jul93.ps
Дата изменения: Wed Sep 16 23:01:03 1998
Дата индексирования: Sun Mar 2 07:58:44 2014
Кодировка:

Поисковые слова: п п р р р р р р р п п п п п п п
SP
ACE
TELESCOPE
SCIENCE
INSTITUTE
TIPS
1
7/7/93
A.
Koratkar
OBSERVING
SUMMARY:
.
Of
the
16
target
acquisitions,
the
FOS
has
experienced
3
target
acquisition
failures
(all
binary
acquisitions)
since
the
last
TIPS.
Two
of
these
failures
(on
day
165
and
166)
were
due
to
HST
safing.The
third
one
(prop
ID
3441)
is
being
investigated.
.
Two
observations
(day
176)
of
prop
ID
3483
were
lost,
because
commands
were
sent
up
by
MOC
while
the
data
was
being
read.
.
The
ongoing
HST
blind­pointing
analysis
shows
that
70.5
%
of
all
FOS
ACQs
within
1
arc
sec
of
nominal
pointing.
.
The
redside
diodes
381
and
307/308
were
discovered
to
be
noisy
and
are
under
observation.

SP
ACE
TELESCOPE
SCIENCE
INSTITUTE
TIPS
2
7/7/93
A.
Koratkar
FOS
CALIBRATION
ACTIVITIES:
June
3rd
to
July
7th.
.
4097
­
Location
of
Spectra:
Y­Base
Maps:
Program
was
run
successfully .
Most
of
the
analysis
is
also
complete
(A.
Koratkar
and
C.
Taylor)
.
4696
­
Wavelength
calibrations:
Data
are
being
analyzed
(T.Keyes).
.
4697
­
Polarimetry
calibrations:
Observations
sucessful.
Data
are
being
ana­
lyzed
(A.
Koratkar).
.
A
scattering
test
for
the
FOS
was
developed
and
the
calibration
proposal
has
been
submitted
(T.
Keyes
and
A.
Koratkar).
.
The
line
spread
functions
have
been
posted
on
STEIS.

SP
ACE
TELESCOPE
SCIENCE
INSTITUTE
TIPS
3
7/7/93
A.
Koratkar
PUBLICATIONS:
.
CAL/FOS­093:
The
FOS
Inverse
Sensitivity
Reference
Files:
A
Quick
Ref­
erence
Guide
to
the
Appropriate
File
for
a
Particular
Date
and
Insturment
Configuration
by
C.
Taylor
and
T.
Keyes.
.
CAL/FOS­094:
FOS
Calibration
Plan
for
Cycle
3,
by
T.
Keyes
and
A.
Ko­
ratkar.
.
CAL/FOS­095:
Location
of
FOS
Polarimetry
Spectra,
by
A.
Koratkar
and
C.
Taylor.
.
CAL/FOS­096:
Location
of
FOS
Spectra:
Cycle
1
and
Cycle
2
Results,
by
A.
Koratkar
and
C.
Taylor,
in
preparation
.
FOS
Data
Reduction
Handbook,
by
A.
Koratkar,
in
preparation.
OTHER
ITEMS:
.
The
Phase
II,
Cycle
3
(supplemental)
GO
proposals
have
been
reviewed.
.
Technical
support
for
Cycle
4
porposal
reviews
is
being
provided.