Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.naic.edu/~phil/pnt/pntCor_1azfit_may11.html
Дата изменения: Fri Jul 1 23:22:24 2011
Дата индексирования: Tue Oct 2 09:56:57 2012
Кодировка:

Поисковые слова: http news.cosmoport.com 2005 04 18 1.htm
Pnt correction after may11 level platform.

may,june11: pnt correction after platform leveling

26may11

Intro
Measuring the 1az term
updating the model.
pointing results after td change and model update


Intro

    Tilt sensor azswings were done in early may11 to measure the residual platform tilt caused by the platform beam repair.  They showed that the platform was no longer level (1 az term in the tilt data). A new tiedown setting was computed from the tilt data to remove the tilt. Before these tiedown changes could be installed, the pointing error caused by this correction needs to be measured and included in then model.

Measuring the 1az term (top)

    Note: the pointing error from the gradual platform tilt during the beam repair had been corrected by modifying the 1az term of the pointing model (during the repair). These changes kept the pointing error small, but the tilt still affected the gain of the telescope as higher frequencies.
    Starting on 15may11 pointing calibrations were done (whenever an x111 rfi observation was available). The setup was:
The plots show the data taken 15may11 through 12jun11 (.ps) (.pdf):
The table below summarizes the fit:

fit c0 +c1*cos(az) + c2*sin(az) or c0 + c3*sin(az-c4)
fit
C0:offset
Asecs
C1:cos(az)
Asecs
C2:sin(az)
Asecs
C3:amplitude
Asecs
C4:phase
deg
FitRms
Asecs
za
-3.39
7.02
2.80
7.6
291.7
3.5
az
1.22
4.59
-7.53
8.8
211.4
5.3


processing: x101/110515/sbhcalib.pro

 

Updating the model: (top)


Pointing results after td change and model update.  (top)


       Data was taken with the tiedowns in their new positions (-.939,.210,.729 inches relative offsets) and with the 1 az model corrections included in the model.

Sources used
date
rcvr
sources
plotSuffix
17jun11
sbn
B0017+154
B2209+08
srcnam_1

21jun11
sbh
B9221+276
B2128+048
B2337+220
srcnam_2
01jul11
sbn
B0032+328
B2325+269
B2249+185(1pat)
srcnam_3

The plots show the pointing errors with the new tiedown positions and the model updated with the 1az fit (.ps) (.pdf):

Compare sbh data with and without the 1az model correction (.ps) (.pdf)


Za error Asecs
Az error (asecs)

mean
rms
mean
rms
no 1az fit
-3.68
6.39
2.98
6.27
with 1az fit
-5.30
3.12
3.07
3.91

Summary: 

processing:x101/110617/chkpnt.pro 110621/chkpnt.pro, 110701/chkpnt.pro


page up
home ~phil