Optics
june 2002
Optics includes the surveys and adjustments
to the reflectors as well as the pitch, roll, and focus
measurements.
I've tried to put together a timeline with names
so that i can reference different data sets below. The dates are
only approximate. A lot of the adjusting overlapped with the
previous measuring.
Measuring only the tiedown cables (2000 targets)
M_TD0dec00
measure targets at reflector tiedown cables before any
adjustments.
ADJ_TD0dec00 adjust dish at the
measured tiedown cables using m_td0 data.
M_TD1jan01
remeasure reflector targets at tiedown cables.
ADJ_TD1mar01: completed second
adjustment of reflector targets at tiedown cables using m_td1
data.
M_TD2 mar01: as part
of m_sur1 below just the tiedown cable targets were measured to
compare with the m_td1 data.
Measuring/adjusting all 38000 targets.
M_SUR1mar01-oct01:
All 38000 targets now installed. Take photos and then measure on
measuring machine. The photo measurements finished around
oct01.
ADJ_SUR1 oct01-nov01. After M_sur1 start adjusting
all the panels. This measurement finished around nov01.
M_SUR2 nov01-mar03. After
ADJ_SUR1
take
the photos in nov/dec01. Remeasure all the photos. The
measurements and computations finished around mar03.