Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIFastTipTilt/TechMeet3?action=diff
Дата изменения: Unknown
Дата индексирования: Sat Mar 1 21:48:18 2014
Кодировка:

Поисковые слова: extreme ultraviolet
OptInt PmWiki : Tech Meet 3 | History
Return to Tech Meet 3  (Edit)

MROIFastTipTilt.TechMeet3 History

Hide minor edits - Show changes to markup

October 22, 2010, at 12:03 PM by 131.111.48.85 -
Changed lines 1-3 from:

This meeting will take place at 13:30 on Friday 14 May, in the Ryle Seminar Room.

to:

Technical Meeting #3: Software requirements and conceptual design

This meeting took place at 13:30 on Friday 14 May, in the Ryle Seminar Room.

May 14, 2010, at 04:10 PM by jsy1001 -
Added line 27:
  • DFB (TBC): Write down initial latency and frame rate requirements with brief justification
May 14, 2010, at 04:04 PM by jsy1001 -
Added lines 10-22:

Conclusions

  • Very preliminary power budget is as follows:
    • Camera cooling 100W
    • Computing 150W
    • Note: once technical interchange begins need to query actual limits on electrical power available, allowed dissipation within electronics cabinets, and allowed dissipation to chilled fluid being used for electronics cabinets
  • A single "standard" computer could run all of the FTT/NA software (under Xenomai)
  • However, cable length restrictions could force us to use a 2nd low-power computer near to the Andor camera
    • This would require a 2nd temperature-controlled enclosure, so best avoided
    • Once technical interchange begins need to query cable routing and whether a dedicated short cable tray can be installed from Q5 to near the camera, to allow use of 1 computer only
  • JSY suggested GUI could be a separate application that is started and stopped independently
  • EBS prefers C (with threads) ISS interface framework
    • Need to think about what combinations of commands might run concurrently and what thread-safety strategy to employ
Added lines 24-26:
  • JSY: Define software components and inter-component dataflows (hardware-independent)
  • JSY: Ask Chris Mayer for field rotation rate
  • EBS: Look for 1U or 2U computers with 2 PCI slots drawing < 150W
May 13, 2010, at 02:19 PM by jsy1001 -
Changed lines 1-10 from:

This meeting will take place at 13:30 on Friday 14 May, in the Ryle Seminar Room.

to:

This meeting will take place at 13:30 on Friday 14 May, in the Ryle Seminar Room.

Agenda

  • FTT/NAS & FLC Software Requirements
  • Next steps leading to a conceptual software architecture

Discussion Slides

Slides as PDF

Task Assignments

May 11, 2010, at 06:36 PM by jsy1001 -
Added line 1:

This meeting will take place at 13:30 on Friday 14 May, in the Ryle Seminar Room.

Recent Changes (All) | Edit SideBar Page last modified on October 22, 2010, at 12:03 PM Edit Page | Page History
Powered by PmWiki