MROIFastTipTilt.TechMeet1 History
Hide minor edits - Show changes to markup
April 30, 2010, at 03:14 PM
by 131.111.48.85 -
Added line 47:
April 30, 2010, at 03:05 PM
by 131.111.48.85 -
Added lines 17-19:
April 30, 2010, at 03:01 PM
by 131.111.48.85 -
Changed line 44 from:
(:includeupload FTT_postTM1.html:)
to:
April 30, 2010, at 02:51 PM
by 131.111.48.85 -
Added lines 42-44:
Concept Map
(:includeupload FTT_postTM1.html:)
April 30, 2010, at 02:17 PM
by 131.111.48.85 -
Changed lines 3-4 from:
This meeting will take place on Friday 30 April at 10:30 in the Ryle Seminar Room. All team members are invited.
to:
This meeting took place on Friday 30 April at 10:30.
Attendees: JSY, MF, CAH, DFB, XS, EBS, ADR, DMAW
Changed lines 19-30 from:
- EBS: liase with ADR about possible sources for off-axis paraboloids
- EBS: chase Princeton for mechanical drawings of camera
- DFB: assign working value for overall image quality requirement
- DFB: assign range for pixel scale
- ADR & CAH: think about how to apportion image quality budget
- ADR & CAH: nominal stability budget
- XS: understand space envelope, optical components & make CAD drawing
- XS: initial studies of achievable stability
- JSY: photon rates
- MF: get available environmental stats
- MF: thermal analysis of camera in box
- DMAW & MF: start thinking about test arrangements
to:
High priority tasks
Need to get results for discussion at next meeting in one week
- DFB & JSY: Assign working value for overall image quality requirement
- Note we will use the working value until it can be refined by simulation
- DFB: Assign range for pixel scale
- ADR & CAH: Think about how to apportion image quality budget
- ADR & CAH: Nominal stability budget
- XS: Understand space envelope, optical components & make CAD drawing
- XS: Initial studies of achievable stability
- MF: Thermal analysis of camera in box
- JSY: Make corrections to appendix of FTT technical requirements document
Lower priority tasks
- ADR: Optical design using off-the-shelf components
- EBS: Liase with ADR about possible sources for off-axis paraboloids
- EBS: Chase Princeton for mechanical drawings of camera
- JSY: Photon rate calculations
- MF: Get available environmental statistics as background information
- DMAW & MF: Start thinking about test arrangements
Next Meeting
A follow-up meeting to discuss initial results from the high priority tasks will take place at 14:00-16:30 on Friday 7 May in the Ryle Seminar Room.
April 30, 2010, at 01:01 PM
by 131.111.1.66 -
Added line 29:
- DMAW & MF: start thinking about test arrangements
April 30, 2010, at 12:58 PM
by 131.111.1.66 -
Changed lines 15-28 from:
to:
Task Assignments
- EBS: liase with ADR about possible sources for off-axis paraboloids
- EBS: chase Princeton for mechanical drawings of camera
- DFB: assign working value for overall image quality requirement
- DFB: assign range for pixel scale
- ADR & CAH: think about how to apportion image quality budget
- ADR & CAH: nominal stability budget
- XS: understand space envelope, optical components & make CAD drawing
- XS: initial studies of achievable stability
- JSY: photon rates
- MF: get available environmental stats
- MF: thermal analysis of camera in box
April 29, 2010, at 04:43 PM
by 131.111.48.85 -
Added lines 1-15:
Technical Meeting #1: Optomechnical design and derived requirements brainstorm
This meeting will take place on Friday 30 April at 10:30 in the Ryle Seminar Room. All team members are invited.
Agenda
- Review of top-level requirements
- Primary functions
- Environment
- Space envelope
- Stability
- Discussion of possible optical layouts and relevant derived requirements for optomechanics
- Next steps
|