Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIFastTipTilt/Requirements?action=diff&source=y&minor=y
Дата изменения: Unknown
Дата индексирования: Sat Mar 1 22:30:32 2014
Кодировка:

Поисковые слова: п п п
OptInt PmWiki : Requirements | History
Return to Requirements  (Edit)

MROIFastTipTilt.Requirements History

Hide minor edits - Show changes to output

August 06, 2010, at 12:34 PM by jsy1001 -
Changed lines 15-18 from:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations. A matrix developed by CAH, MF and ADR attempts to identify all derived requirements and can be used to check if we have captured them all: [[Attach:derived-requirements matrix-v1.pdf | Derived Requirements Matrix]]

The derived requirements are being written up in a document, based on this outline:
[[Derived Requirements Document Outline]]. Results and analysis to be incorporated into the document may be collated by attaching to this wiki page, please refer to the following sections.
to:

The above top-level requirements have been flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations. A matrix developed by CAH, MF and ADR attempts to identify all derived requirements and can be used to check if we have captured them all: [[Attach:derived-requirements matrix-v1.pdf | Derived Requirements Matrix]]

The derived requirements are being written up in the document: [[Attach:derived_merged.pdf | MRO-TRE-CAM-0000-0101: Derived Requirements]]

Some results and analysis for the document have been attached to this wiki page, please refer to the following sections.
June 25, 2010, at 09:20 AM by adr34 -
Changed line 22 from:
The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet6]] and the "zoom" variation agreed at [[TechMeet7]].
to:
The [[Attach:budgets.pdf | attached table]] gives stability error budgets for the layouts agreed at [[TechMeet6]] and the "zoom" variation agreed at [[TechMeet7]].
June 24, 2010, at 04:55 PM by jsy1001 -
Changed line 22 from:
The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet6]].
to:
The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet6]] and the "zoom" variation agreed at [[TechMeet7]].
June 24, 2010, at 01:52 PM by jsy1001 -
Changed lines 15-19 from:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations. A matrix developed by CAH, MF and ADR attempts to identify all derived requirements and can be used to check if we have captured them all.
*[[Attach:derived-requirements matrix-v1.pdf | Derived Requirements Matrix]]

[[Derived Requirements Document Outline]]
to:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations. A matrix developed by CAH, MF and ADR attempts to identify all derived requirements and can be used to check if we have captured them all: [[Attach:derived-requirements matrix-v1.pdf | Derived Requirements Matrix]]

The derived requirements are being written up in a document, based on this outline:
[[Derived Requirements Document Outline]]. Results and analysis to be incorporated into the document may be collated by attaching to this wiki page, please refer to the following sections.
Changed line 22 from:
The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet7]]
to:
The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet6]].
June 24, 2010, at 01:49 PM by jsy1001 -
Changed lines 18-22 from:
[[Derived Requirements Document Outline]]
to:
[[Derived Requirements Document Outline]]

!!!Stability & Image Quality

The [[Attach:budgets.pdf | attached table]] gives error budgets for the layouts agreed at [[TechMeet7]]
May 21, 2010, at 10:05 AM by MF - Uploaded a derived requirements matrix
Changed lines 15-16 from:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations.
to:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations. A matrix developed by CAH, MF and ADR attempts to identify all derived requirements and can be used to check if we have captured them all.
*[[Attach:derived-requirements matrix-v1.pdf | Derived Requirements Matrix]]
May 20, 2010, at 04:46 PM by jsy1001 -
Added line 9:
** Refers to [[Attach:INT-403-TSP-0003.pdf | UTM Technical Requirements]]
May 20, 2010, at 01:43 PM by jsy1001 -
Changed lines 14-16 from:
The above top-level requirements will be flowed down to a set of derived requirements by means of a several brainstorming sessions and appropriate analysis/simulations.
to:
The above top-level requirements are being flowed down to a set of derived requirements by means of brainstorming sessions and appropriate analysis/simulations.

[[Derived Requirements Document Outline]]
April 23, 2010, at 05:56 PM by 131.111.48.85 -
Added line 10:
* [[Attach:compare_FTT_FLC.pdf | FTT/NAS vs FLC: Comparison of Technical Requirements]]
April 23, 2010, at 03:42 PM by 131.111.48.85 -
Changed line 8 from:
* FLC Technical Requirements INT-403-TSP-0107
to:
* [[Attach:FLC_summary.pdf | FLC Technical Requirements INT-403-TSP-0107]]
April 23, 2010, at 12:37 PM by 131.111.48.85 -
Added lines 1-13:
!!Top-level Requirements

There are separate requirements documents for the Fast Tip-Tilt/Narrow-field Acquisition System (FTT/NAS) and First Light Camera (FLC):

* [[Attach:tip_tilt.pdf | FTT/NAS Technical Requirements INT-403-ENG-0003]]
** Note that revision 2.0 was prepared in Oct 2009 for a Request For Proposals that NMT never released

* FLC Technical Requirements INT-403-TSP-0107


!!Derived Requirements

The above top-level requirements will be flowed down to a set of derived requirements by means of a several brainstorming sessions and appropriate analysis/simulations.
Recent Changes (All) | Edit SideBar Page last modified on August 06, 2010, at 12:34 PM Edit Page | Page History
Powered by PmWiki