MROIFastTipTilt.ConceptualDesignReview History
Hide minor edits - Show changes to markup
September 13, 2010, at 04:16 PM
by jsy1001 -
Added lines 4-6:
September 07, 2010, at 10:52 AM
by jsy1001 -
Changed line 3 from:
The CoDR will be conducted by teleconference on 14 September 2010.
to:
The CoDR will be conducted by teleconference on 14 September 2010. The scope and agenda for the review are described in INT-403-CON-0130.
September 03, 2010, at 08:49 PM
by jsy1001 -
Changed line 15 from:
- MRO-LIS-CAM-0000-0100 CoDR Data Package List (JSY)
to:
Changed lines 20-21 from:
- MRO-TRE-CAM-0000-0105 FLC Requirements Compliance Matrix (JSY)
- MRO-PLA-CAM-0000-0106 FTT/NAS & FLC Development Plan (MF)
to:
September 03, 2010, at 08:45 PM
by jsy1001 -
Changed line 18 from:
- MRO-TRE-CAM-0000-0103 FLC Conceptual Design Report (JSY)
to:
August 31, 2010, at 11:16 PM
by 86.22.77.214 -
Changed line 17 from:
- MRO-TRE-CAM-0000-0102 FTT/NAS Conceptual Design Report
to:
August 31, 2010, at 11:07 PM
by 86.22.77.214 -
Changed line 19 from:
- MRO-TRE-CAM-0000-0104 FTT/NAS Requirements Compliance Matrix (JSY)
to:
August 31, 2010, at 08:49 PM
by 86.22.77.214 -
August 31, 2010, at 08:47 PM
by 86.22.77.214 -
Changed line 3 from:
The CoDR will be conducted by teleconference on 9 September 2010.
to:
The CoDR will be conducted by teleconference on 14 September 2010.
August 31, 2010, at 08:46 PM
by 86.22.77.214 -
Changed lines 16-17 from:
to:
Changed line 22 from:
- MRO-LIS-CAM-0000-0107 ICD List and Expected Content (MF)
to:
August 27, 2010, at 12:30 PM
by jsy1001 -
Changed lines 19-20 from:
- MRO-TRE-CAM-0000-0104 FTT/NAS Requirements Verification Matrix (JSY)
- MRO-TRE-CAM-0000-0105 FLC Requirements Verification Matrix (JSY)
to:
- MRO-TRE-CAM-0000-0104 FTT/NAS Requirements Compliance Matrix (JSY)
- MRO-TRE-CAM-0000-0105 FLC Requirements Compliance Matrix (JSY)
August 06, 2010, at 02:15 PM
by jsy1001 -
Changed line 11 from:
to:
August 06, 2010, at 02:14 PM
by jsy1001 -
Changed line 10 from:
to:
August 06, 2010, at 02:13 PM
by jsy1001 -
Changed line 8 from:
- INT-403-CON-0128 Statement of Work: Fast Tip Tilt/Narrow-field Acquisition System Development Phase 1a and Option for Phase 1b - version of May 20th 2010
to:
August 06, 2010, at 01:56 PM
by jsy1001 -
Changed line 9 from:
to:
August 06, 2010, at 01:55 PM
by jsy1001 -
Added lines 3-4:
The CoDR will be conducted by teleconference on 9 September 2010.
Changed lines 7-22 from:
to:
Reference Documents
Documents for Review
- MRO-LIS-CAM-0000-0100 CoDR Data Package List (JSY)
- MRO-TRE-CAM-0000-0101 Derived Requirements (JSY to collate)
- MRO-TRE-CAM-0000-0102 FTT/NAS Conceptual Design Report (JSY to collate)
- MRO-TRE-CAM-0000-0103 FLC Conceptual Design Report (JSY)
- MRO-TRE-CAM-0000-0104 FTT/NAS Requirements Verification Matrix (JSY)
- MRO-TRE-CAM-0000-0105 FLC Requirements Verification Matrix (JSY)
- MRO-PLA-CAM-0000-0106 FTT/NAS & FLC Development Plan (MF)
- MRO-LIS-CAM-0000-0107 ICD List and Expected Content (MF)
August 06, 2010, at 12:51 PM
by jsy1001 -
Added lines 1-5:
Conceptual Design Review
CoDR Documents
XXX
|