Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIFastTipTilt/Meetings?action=diff
Дата изменения: Unknown
Дата индексирования: Sat Mar 1 21:45:30 2014
Кодировка:

Поисковые слова: п п п п п п п п п п п п п п
OptInt PmWiki : Meetings | History
Return to Meetings  (Edit)

MROIFastTipTilt.Meetings History

Hide minor edits - Show changes to markup

April 23, 2013, at 04:23 PM by jsy1001 -
Added lines 31-35:

Final Design & Delivery Phase

  1. Review of integrated test results, baseplate design @ 2013/03/07 15:00-17:00
May 23, 2011, at 02:20 PM by 131.111.48.85 -
Added line 30:
  1. Optical layout for PDR @ 2011/05/23 09:30-11:00
May 16, 2011, at 10:55 AM by 131.111.48.85 -
Added lines 28-29:
  1. FLC software design @ 2011/05/10 11:30-13:00
  2. Component testing brainstorm @ 2011/05/16 09:30-11:00
November 17, 2010, at 12:22 PM by jsy1001 -
Added line 27:
  1. Software design (continued) @ 2010/11/18 11:30-13:00
October 28, 2010, at 05:37 PM by jsy1001 -
Changed line 25 from:
  1. Testing brainstorm @ 2010/10/25 09:30-11:00
to:
  1. Testing brainstorm @ 2010/10/25 09:30-11:00
October 22, 2010, at 11:58 AM by 131.111.48.85 -
Added lines 10-11:

CoDR Phase

Changed lines 21-26 from:
  1. Selection of preferred layout(s) @ 2010/07/30 14:00-16:00
to:
  1. Selection of preferred layout(s) @ 2010/07/30 14:00-16:00

PDR Phase

  1. Testing brainstorm @ 2010/10/25 09:30-11:00
  2. Software design @ 2010/10/27 14:00-15:30
August 03, 2010, at 05:00 PM by jsy1001 -
Changed lines 18-19 from:
  1. Conceptual mechanical design and analysis II @ 2010/06/24 14:00-16:30 (Ryle)
to:
  1. Conceptual mechanical design and analysis II @ 2010/06/24 14:00-16:30 (Ryle)
  2. Selection of preferred layout(s) @ 2010/07/30 14:00-16:00
June 24, 2010, at 01:37 PM by jsy1001 -
Added line 18:
  1. Conceptual mechanical design and analysis II @ 2010/06/24 14:00-16:30 (Ryle)
June 15, 2010, at 05:38 PM by jsy1001 -
Changed line 17 from:
to:
  1. Software conceptual design @ 2010/06/15 15:00-16:30 (911)
June 10, 2010, at 03:35 PM by jsy1001 -
Changed line 16 from:
  1. Conceptual mechanical design @ 2010/06/10 14:00-16:00 (Ryle)
to:
  1. Conceptual mechanical design and analysis @ 2010/06/10 14:00-16:00 (Ryle)
June 10, 2010, at 03:32 PM by jsy1001 -
Added lines 16-17:
  1. Conceptual mechanical design @ 2010/06/10 14:00-16:00 (Ryle)
June 02, 2010, at 01:45 PM by jsy1001 -
Added line 15:
  1. Optical layouts for CoDR @ 2010/06/03 14:00-16:30 (911)
May 25, 2010, at 01:07 PM by jsy1001 -
Changed line 14 from:
  1. Camera selection @ 2010/05/28 14:00-16:00
to:
  1. Camera selection @ 2010/05/28 14:00-16:00 (Ryle)
May 25, 2010, at 01:07 PM by jsy1001 -
Added line 14:
  1. Camera selection @ 2010/05/28 14:00-16:00
May 21, 2010, at 05:20 PM by jsy1001 -
Added lines 8-9:

Discussion slides should be attached to each meeting's own page.

Deleted line 13:
May 21, 2010, at 10:09 AM by MF - uploaded overheads for camera thermal discussion
Changed lines 11-12 from:
  1. Optomechanical and thermal conceptual design @ 2010/05/21 14:00-16:30 (Ryle)
to: