Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIDelayLineSW/RequirementsReview?action=diff&source=y&minor=y
Дата изменения: Unknown
Дата индексирования: Sat Mar 1 22:36:11 2014
Кодировка:

Поисковые слова: arp 220
OptInt PmWiki : Requirements Review | History
Return to Requirements Review  (Edit)

MROIDelayLineSW.RequirementsReview History

Hide minor edits - Show changes to output

January 13, 2010, at 05:31 PM by 131.111.48.85 -
Changed line 3 from:
The requirements review took place on 21 May 2009. The attached requirements document was revised following the review to reflect what was agreed.
to:
The requirements review took place on 21 May 2009. The attached requirements document was revised following the review to reflect what was agreed, and again prior to the PDR.
June 03, 2009, at 01:48 PM by jsy1001 -
Deleted lines 0-1:
The requirements review is scheduled for 21 May 2009.
Changed lines 3-4 from:
* [[Attach:sw_req_discussion.pdf | Requirement specifications for the MROI production delay line software]]
to:
The requirements review took place on 21 May 2009. The attached requirements document was revised following the review to reflect what was agreed.

* [[Attach:sw_req.pdf | Requirement specifications for the MROI production delay line software]]
May 19, 2009, at 06:27 PM by jsy1001 -
Changed lines 1-2 from:
The requirements review is now tentatively scheduled for 12 May (check with Allen - was originally 15 April 2009).
to:
The requirements review is scheduled for 21 May 2009.
Changed lines 5-6 from:
* Requirement specifications for the MROI production delay line software (in prep)
to:
* [[Attach:sw_req_discussion.pdf | Requirement specifications for the MROI production delay line software]]
April 24, 2009, at 12:40 PM by jsy1001 -
Added lines 24-25:
* [[Attach:AAS_SRS.pdf | Software Requirements Specification for Automated Alignment System]]
April 22, 2009, at 12:41 PM by jsy1001 -
Added line 23:
* [[Attach:ICS_if.pdf | ICS/Delay Line Information Flow]]
April 22, 2009, at 12:10 PM by jsy1001 -
Changed lines 15-17 from:
* [[Attach:MROIDelayLine.DesignDocumentation/metrology.pdf | Metrology System & VME Hardware Design Description (INT-406-VEN-0113)]]

to:
* [[Attach:MROIDelayLine.DesignDocumentation/metrology.pdf | Metrology System & VME Hardware Design Description]]

April 22, 2009, at 12:09 PM by jsy1001 -
Changed lines 12-13 from:
* [[Attach:MROIDelayLine.TestResults/TestList.pdf | List of tests]]
to:
* [[Attach:MROIDelayLine.TestResults/TestList.pdf | List of Tests]]
* [[Attach:MROIDelayLine.FinalDesignReviewMaterial/cartelec.pdf | Trolley Electronics Design Description]]
* [[Attach:MROIDelayLine.DesignDocumentation/shearcam.pdf | Shear Camera Software Functional Description]]
* [[Attach:MROIDelayLine.DesignDocumentation/metrology.pdf | Metrology System & VME Hardware Design Description (INT-406-VEN-0113)]]

April 22, 2009, at 11:55 AM by jsy1001 -
Changed lines 12-13 from:
to:
* [[Attach:MROIDelayLine.TestResults/TestList.pdf | List of tests]]
April 21, 2009, at 05:53 PM by jsy1001 -
Changed line 9 from:
* Statement of Work (not attached as it contains confidential salary costs)
to:
* Delay Line Production Software Development Statement of Work (not attached as it contains confidential salary costs)
April 21, 2009, at 05:50 PM by jsy1001 -
Changed line 17 from:
* Prototype [[Attach:MROIDelayLine.DelayLinePrototypeSoftware/coding_std.pdf | Coding Standards]]
to:
* [[Attach:MROIDelayLine.DelayLinePrototypeSoftware/coding_std.pdf | Coding and Documentation Guidelines for Prototype Delay Line Software]]
April 21, 2009, at 05:40 PM by jsy1001 -
Added lines 1-17:
The requirements review is now tentatively scheduled for 12 May (check with Allen - was originally 15 April 2009).

!!Requirements Document

* Requirement specifications for the MROI production delay line software (in prep)

!!Reference Documents

* Statement of Work (not attached as it contains confidential salary costs)
* [[Attach:MROIDelayLine.DesignDocumentation/system.pdf | System Overview]]
* [[Attach:MROIDelayLine.Requirements/INT-406-TSP-0002.pdf | Requirements Specification for the MROI Delay Line System]]

!!Applicable Documents

* [[Attach:INT-414-TSP-0004.pdf | Commissioning Plan and Performance Verification Milestones for the MROI]]
* Prototype [[Attach:MROIDelayLine.DesignDocumentation/control_sw_arch.pdf | Control Software Architecture]]
* Prototype [[Attach:MROIDelayLine.DelayLinePrototypeSoftware/coding_std.pdf | Coding Standards]]
Recent Changes (All) | Edit SideBar Page last modified on January 13, 2010, at 05:31 PM Edit Page | Page History
Powered by PmWiki