MROIDelayLineSW.ProductionSoftwarePDRToDoList History
Show minor edits - Show changes to markup
January 15, 2010, at 10:58 AM
by 131.111.48.85 -
Changed line 11 from:
to:
January 14, 2010, at 01:12 PM
by 131.111.48.85 -
Changed line 13 from:
- Analysis GUI Functional Description
- To be written (MF), based on existing document
to:
- Delay Line Analysis GUI Description
- To be written (MF), based on existing document
January 13, 2010, at 06:10 PM
by 131.111.48.85 -
Changed line 3 from:
- Production Delay Line Software Architecture
- New document to be written (JSY)
to:
- Production Delay Line Control Software Architecture
- New document to be written (JSY)
Changed line 12 from:
- Transmission of shearcam video to workstation
to:
- Transmission of shearcam video to workstation using dlmsg extension (see protocols doc)
January 13, 2010, at 11:58 AM
by 131.111.48.85 -
Changed line 4 from:
to:
January 12, 2010, at 05:02 PM
by 131.111.48.85 -
Changed lines 8-10 from:
to:
- Production Trolley Software Functional Description
- To be written (EBS), based on Trolley Software Functional Description for DL FDR. Will mention functionality not in prototype software:
- Lock preventing rtune from starting when alacarte running
- Will this be in prototype software?
January 11, 2010, at 10:25 AM
by 131.111.48.85 -
Changed lines 11-13 from:
to:
- Analysis GUI Functional Description
- To be written (MF), based on existing document
- Production Delay Line Software Verification Plan
- New document to be written (JSY) - draft only
Added line 16:
- Relationship to prototype software
Changed lines 23-25 from:
- Compliance matrix, conclusions
to:
- Compliance matrix
- Verification plan
- Conclusions
January 05, 2010, at 04:40 PM
by 131.111.48.85 -
Changed lines 3-10 from:
to:
- Production Delay Line Software Architecture
- New document to be written (JSY)
- Network Message Protocols and Log File Format
- Describes protocols/FITS conventions common to prototype and production software. Need to update introduction (JSY)
- Production Delay Line Software Compliance Matrix
- New spreadsheet to be written (JSY)
- Production Workstation Software Functional Description
- New document to be written (JSY)
- Production Metrology Software Functional Description
- New document to be written (EBS)
- Production Trolley Software Functional Description
- To be written (EBS), based on Trolley Software Functional Description for DL FDR
- Production Shear Camera Software Functional Description
- To be written (EBS), based on Shear Camera Software Functional Description for DL FDR
January 05, 2010, at 04:17 PM
by 131.111.48.85 -
Added lines 1-20:
|