MROIDelayLineSW.PreliminaryDesignReview History
Hide minor edits - Show changes to markup
January 26, 2010, at 09:49 PM
by 129.138.240.116 -
Changed lines 1-5 from:
The Preliminary Design Review for the Production Software Contract will take place at 8.30am MST (3.30pm GMT) on 1 February 2010. Teleconference information to be confirmed.
to:
The Preliminary Design Review for the Production Software Contract will take place at 8.30am MST (3.30pm GMT) on 1 February 2010.
Teleconference information:
- Dial 1-866-476-8702 (Toll free in US) or 1-916-233-4200 (International)
- Enter participant PIN: 21409#
January 25, 2010, at 10:17 PM
by 129.138.240.116 -
Deleted lines 3-4:
Links to the remaining documents will be posted on Monday 25 January.
January 25, 2010, at 10:11 PM
by 129.138.240.116 -
Changed line 14 from:
- Compliance matrix for the MROI production delay line software (INT-406-VEN-1008)
to:
January 25, 2010, at 09:23 PM
by 129.138.240.116 -
Changed line 11 from:
- Production Shear Sensor Software Functional Description (INT-406-VEN-1005)
to:
Changed line 15 from:
- Verification plan for the MROI production delay line software (INT-406-VEN-1009)
to:
January 22, 2010, at 11:13 PM
by 129.138.240.116 -
Deleted lines 1-2:
January 22, 2010, at 11:12 PM
by 129.138.240.116 -
Changed line 9 from:
- Production Delay Line Control Software Architecture (INT-406-VEN-1001)
to:
January 22, 2010, at 10:21 PM
by 129.138.240.116 -
Changed lines 7-8 from:
Links to these documents will be posted by Monday 25 January.
to:
Links to the remaining documents will be posted on Monday 25 January.
Changed line 11 from:
- Production Workstation Software Functional Description (INT-406-VEN-1003)
to:
January 22, 2010, at 06:55 PM
by 129.138.240.116 -
Changed line 10 from:
- Production Trolley Software Functional Description (INT-406-VEN-1002)
to:
Changed line 12 from:
- Production Metrology Software Functional Description (INT-406-VEN-1004)
to:
January 22, 2010, at 05:52 PM
by 129.138.240.116 -
Changed line 14 from:
- Delay Line Analysis GUI Functional Description (INT-406-VEN-1006)
to:
January 22, 2010, at 04:09 PM
by 129.138.240.116 -
Added lines 37-39:
January 21, 2010, at 11:50 PM
by 129.138.240.116 -
Added lines 16-17:
- Compliance matrix for the MROI production delay line software (INT-406-VEN-1008)
- Verification plan for the MROI production delay line software (INT-406-VEN-1009)
January 21, 2010, at 11:40 PM
by 129.138.240.116 -
Changed lines 9-15 from:
to:
- Production Delay Line Control Software Architecture (INT-406-VEN-1001)
- Production Trolley Software Functional Description (INT-406-VEN-1002)
- Production Workstation Software Functional Description (INT-406-VEN-1003)
- Production Metrology Software Functional Description (INT-406-VEN-1004)
- Production Shear Sensor Software Functional Description (INT-406-VEN-1005)
- Delay Line Analysis GUI Functional Description (INT-406-VEN-1006)
- Network Message Protocols and Telemetry/Status/Logs File Format (INT-406-VEN-1007)
January 21, 2010, at 06:15 PM
by 129.138.240.116 -
Changed lines 9-10 from:
to:
Added line 17:
Changed line 28 from:
to:
January 21, 2010, at 05:57 PM
by 129.138.240.116 -
Changed lines 3-26 from:
to:
Please refer to the Production Software PDR To Do List for tasks to be done prior to the PDR.
Review Documents
Links to these documents will be posted by Monday 25 January.
Other Reference and Applicable Documents
January 11, 2010, at 10:17 AM
by 131.111.48.85 -
Changed line 1 from:
The Preliminary Design Review for the Production Software Contract will take place around 1 February 2010. The exact date is to be confirmed.
to:
The Preliminary Design Review for the Production Software Contract will take place at 8.30am MST (3.30pm GMT) on 1 February 2010. Teleconference information to be confirmed.
January 05, 2010, at 03:57 PM
by 131.111.48.85 -
Added lines 1-3:
The Preliminary Design Review for the Production Software Contract will take place around 1 February 2010. The exact date is to be confirmed.
Please refer to the Production Software PDR To Do List for tasks to be done prior to the PDR.
|