Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIDelayLine/FinalDesignReviewMaterial?action=print
Дата изменения: Unknown Дата индексирования: Sat Mar 1 22:19:28 2014 Кодировка: Поисковые слова: ultraviolet |
This page was used in the lead-up to the 2007 Final Design Review to summarise the status of the documents being prepared. The links point to the latest version of the documents, which in some cases have been revised since the review.
The list of FDR documents is based on MF's FDR Proposal Document.
See also: FDRTodoLists DraftTestList
Please upload your document in PDF format to the appropriate page linked from the first column in the table below (rather than this page) - for example, the "Derived Requirements" document should be uploaded to Requirements. You should then make a link from this page (from the table) to the uploaded document.
Document templates may be obtained from DocMan.
To release a document, place a link to it on the ReleasedFDRDocuments page.
Upload to | Document | Identifier | Responsible | Due Date | Expected Date | Status |
---|---|---|---|---|---|---|
Design Documentation | ||||||
System Overview | INT-406-VEN-0100 | 6 July 07 | - | Complete | ||
Control Software Architecture | INT-406-VEN-0101 | JSY | 6 July 07 | - | Released | |
Trolley Software Functional Description | INT-406-VEN-0102 | EBS | 6 July 07 | - | Released | |
Workstation Software Functional Description | INT-406-VEN-0103 | JSY | 6 July 07 | - | Released | |
VME Software Functional Description | INT-406-VEN-0104 | RCB | 22 Jan 08 | 22 Jan 08 | Released | |
Shear Camera Software Funtional Description | INT-406-VEN-0105 | EBS | 6 July 07 | - | Released | |
Requirements | ||||||
Top-level Requirements | INT-406-TSP-0002 | FS | 6 July 07 | - | Updated by FS |
Upload to | Document | Identifier | Responsibles | Due Date | Expected Date | Status |
---|---|---|---|---|---|---|
Management: for review | ||||||
Schedule and budget overview | INT-406-VEN-0106 | DFB | 22 Jan 08 | 29 Jan 08 | To be drafted | |
MRO Delay Line Documentation Plan | INT-406-VEN-0120 | MF | 22 Jan 08 | 8 Feb 08 | Drafted | |
Management: for internal review | ||||||
Schedule for delivery of 1st production trolley | INT-406-VEN-xxxx | DFB | 22 Jan 08 | 29 Jan 08 | To be drafted | |
Schedule for Campus Acceptance Tests | INT-406-VEN-xxxx | DFB | 22 Jan 08 | 29 Jan 08 | To be drafted | |
Contract Deliverables List | INT-406-VEN-0124 | DFB | 22 Jan 08 | 29 Jan 08 | Exists in contract | |
Production Phase Budgets | INT-406-VEN-0125 | DFB | 22 Jan 08 | 29 Jan 08 | To be drafted | |
Requirements | ||||||
Derived Requirements | INT-406-VEN-0107 | DFB | 22 Jan 08 | 29 Jan 08 | Released | |
Design Drawings | ||||||
Trolley | - | XS | 22 Jan 08 | 11 Jan 08 | Updated | |
Delay Line Pipes and Supports | - | XS | 8 Jan 2008 | 8 Jan 08 | Released | |
Metrology Layout (for Magdalena Ridge) | see metrology design description INT-406-VEN-0113 | XS | 22 Jan 08 | 22 Jan 08 | 3D design completed | |
Design Documentation | ||||||
Trolley Mechanical Design Description | INT-406-VEN-0111 | MF/XS/DMAW | 6 July 07 | 29 Jan 08 | Released (TBU) | |
Trolley Electronics Design Description | INT-406-VEN-0112 | MF/RCB/DMAW/EBS | 22 Jan 08 | 29 Jan 08 | Released | |
Metrology System & VME Hardware Design Description (inc. test rig) | INT-406-VEN-0113 | RCB | 22 Jan 08 | 29 Jan 08 | Released | |
Metrology Laser Choice | INT-406-VEN-0114 | CAH | 22 Jan 08 | 29 Jan 08 | Released | |
Delay Line Pipes and Supports Design Description | INT-406-VEN-0115 | MF/XS/DMAW | 22 Jan 08 | 7 Feb 08 | Released | |
Limits Design Description | INT-406-VEN-0116 | MF | 22 Jan 08 | 8 Feb 08 | Released (TBU) | |
Component Documentation | ||||||
Proposed design revisions | INT-406-VEN-0117 | MF | 22 Jan 08 | 12 Feb 08 | To be drafted | |
Component Lists | INT-406-VEN-0118 | MF | 22 Jan 08 | 12 Feb 08 | Drafted (TBU) | |
Handling Procedures | ||||||
Proposed Delay Line Set-up Tools, Jigs and Procedures | INT-406-VEN-0119 | MF/XS/DMAW | 22 Jan 08 | 5 Feb 08 | Released | |
Test Results | ||||||
List of tests | INT-406-VEN-0108 | MF | 22 Jan 08 | 7 Feb 08 | Released | |
Performance Test Results | INT-406-VEN-0109 | MF | 22 Jan 08 | 7 Feb 08 | Released | |
Test Results Appendix B part1 | INT-406-VEN-0109 | MF | 22 Jan 08 | 8 Feb 08 | Released | |
Test Results Appendix B part2 | INT-406-VEN-0109 | MF | 22 Jan 08 | 8 Feb 08 | Released | |
Production trolley Acceptance Test Plan | INT-406-VEN-0110 | DFB | 22 Jan 08 | 29 Jan 08 | To be drafted | |
Risk and Hazard Assessment | ||||||
Risk and Hazard document | INT-406-VEN-0121 | MF | 22 Jan 08 | 8 Feb 08 | Released | |
Interface Control | ||||||
ICD: Delay line to Beam Relay system | INT-406-VEN-0008 | MF | 6 Nov 07 | 28 May 2009 | Updated | |
ICD: Delay line to BCF infrastructure (building) | INT-406-VEN-0009 | MF | 21 Dec 07 | 20 May 09 | Updated | |
ICD: Delay line to metrology system | INT-406-VEN-0010 | MF | 6 Nov 07 | - | Released | |
ICD: Delay line to vacuum system | INT-406-VEN-0011 | MF | 22 Jan 08 | 22 Jan 08 | Released | |
ICD: Metrology System to BCF | INT-406-VEN-0012 | MF | 6 Nov 07 | 29 May 2009 | Updated | |
ICD: Metrology System to Beam Relay System | INT-406-VEN-0013 | MF | 6 Nov 07 | - | Released | |
FDR Overheads | 11 Feb 08 | 11 Feb 08 | To be drafted |
Click here to upload file to attach to this page.