ID | Milestone | Person(s) | Due Date | Status |
1 | Beam size memos | DFB | | Delivered |
2 | Generic Switchyard Requirements | JC | | Delivered |
3 | Devise slide tests | CJ | | Complete |
4 | Survey of commercial slides | CP | | Complete |
5 | Generic Detector Requirements | JSY | | Delivered |
6 | P4S combiner optimization | JC | | Complete |
7 | P4S switchyard optimization | JC | | Complete |
8 | P8 combiner optimization | JC | | Complete |
9 | P8 (internal) switchyard optimization | JC | | Complete |
10 | P4/P8 manufacturer dialogue | JC | Due 2006/07/31 | 70% done |
11 | P4S/P8 spectrograph optimization | CJ | Due 2006/09/01 | 70% done |
12 | I4S combiner optimization | FB | Due 2006/07/17 | 90% done |
13 | I4S switchyard optimization | JC | | 80% done |
14 | I6 combiner optimization | FB | Due 2006/07/17 | 90% done |
15 | Optical interface with fringe tracker | JC/CJ | Due 2006/08/14 | 80% done |
16 | Slide tests Phase 1 (1 slide, tip-tilt repeatability) | CP | Due 2006/08/14 | Complete |
17 | Spatial filter evaluation | MCE | Due 2006/09/11 | 50% done |
18 | Alignability evaluation | JC/CJ | Due 2006/10/23 | 10% done |
19 | Modulator requirements | DFB | Due 2006/07/31 | 0% done |
20 | Modulator tip-tilt tests | JC | Due 2006/09/25 | 20% done |
21 | Signal-to-noise calculation | JSY | Due 2006/10/09 | 30% done |
22 | Slide tests Phase 2 (2 slides, OPD repeatability) | CP | Due 2006/10/16 | Awaiting slide |
23 | Imaging speed calculation | JSY | Due 2006/10/23 | Waiting on 21 |
24 | Costing | JSY | Due 2006/10/23 | Waiting on 10 |
25 | Final Report | JSY | Due 2006/11/06 |
26 | Preliminary design for downselected concept | FB/JC | Due 2006/11/27 |
The following beam combiner concepts are being considered:
The choice of switchyard for each concept also impacts the design of the FT switchyard. See Switchyards.