MROI.ScienceInstrumentDownselect History
Hide minor edits - Show changes to output
May 04, 2007, at 03:37 PM
by 131.111.48.85 -
May 04, 2007, at 03:36 PM
by 131.111.48.85 -
Changed lines 3-4 from:
to:
* [[(Attach:)bc_mroi_spie06_approved.pdf | Proc. SPIE paper on downselect]]
May 04, 2007, at 03:31 PM
by 131.111.48.85 -
Changed line 36 from:
to:
May 04, 2007, at 03:24 PM
by 131.111.48.85 -
Changed lines 37-39 from:
to:
* I6
The choice of switchyard for each concept also impacts the design of the FT switchyard. See [[Switchyards]].
March 09, 2007, at 05:30 PM
by John Young - Status from 2006/10/12 update (see attachment)
Changed lines 1-30 from:
[[(Attach:)downselect_defn.pdf | Workpackage Definition]]
||! Milestone ||! Person(s) ||! Status || ||Beam size memos || DFB ||Delivered || ||Generic Switchyard Requirements || JC ||Delivered || ||Devise slide tests || CJ ||Complete || ||Survey of commercial slides || CP ||Complete || ||Generic Detector Requirements || JSY ||Delivered || ||P4S combiner optimization || JC ||Complete || ||P4S switchyard optimization || JC ||Complete || ||P8 combiner optimization || JC ||Complete || ||P8 (internal) switchyard optimization || JC ||Complete || ||P4/P8 manufacturer dialogue || JC ||Due 2006/07/31 || ||P4S/P8 spectrograph optimization || CJ ||Due 2006/09/01 || ||I4S combiner optimization || FB ||Due 2006/07/17 || ||I4S switchyard optimization || JC ||Complete || ||I6 combiner optimization || FB ||Due 2006/07/17 || ||Optical interface with fringe tracker || JC/CJ ||Due 2006/08/14 || ||Slide tests Phase 1 (1 slide, tip-tilt repeatability) || CP ||Due 2006/08/14 || ||Spatial filter evaluation || MCE ||Due 2006/09/11 || ||Alignability evaluation || JC/CJ ||Due 2006/10/23 || ||Modulator requirements || DFB ||Due 2006/07/31 || ||Modulator tip-tilt tests || JC ||Due 2006/09/25 || ||Signal-to-noise calculation || JSY ||Due 2006/10/09 || ||Slide tests Phase 2 (2 slides, OPD repeatability) || CP ||Due 2006/10/16 || ||Imaging speed calculation || JSY ||Due 2006/10/23 || ||Costing || JSY ||Due 2006/10/23 || ||Final Report || JSY ||Due 2006/11/06 || ||Preliminary design for downselected concept || FB/JC ||Due 2006/11/27 ||
to:
* [[(Attach:)downselect_defn.pdf | Workpackage Definition]] * [[(Attach:)downselect_status_20061012.pdf | Workpackage Status 2006/10/12]]
|| ID ||! Milestone ||! Person(s) ||! Due Date ||! Status || ||1 ||Beam size memos || DFB || ||Delivered || ||2 ||Generic Switchyard Requirements || JC || ||Delivered || ||3 ||Devise slide tests || CJ || ||Complete || ||4 ||Survey of commercial slides || CP || ||Complete || ||5 ||Generic Detector Requirements || JSY || ||Delivered || ||6 ||P4S combiner optimization || JC || ||Complete || ||7 ||P4S switchyard optimization || JC || ||Complete || ||8 ||P8 combiner optimization || JC || ||Complete || ||9 ||P8 (internal) switchyard optimization || JC || ||Complete || ||10 ||P4/P8 manufacturer dialogue || JC ||Due 2006/07/31 ||70% done || ||11 ||P4S/P8 spectrograph optimization || CJ ||Due 2006/09/01 ||70% done || ||12 ||I4S combiner optimization || FB ||Due 2006/07/17 ||90% done || ||13 ||I4S switchyard optimization || JC || ||80% done || ||14 ||I6 combiner optimization || FB ||Due 2006/07/17 ||90% done || ||15 ||Optical interface with fringe tracker || JC/CJ ||Due 2006/08/14 ||80% done || ||16 ||Slide tests Phase 1 (1 slide, tip-tilt repeatability) || CP ||Due 2006/08/14 ||Complete || ||17 ||Spatial filter evaluation || MCE ||Due 2006/09/11 ||50% done || ||18 ||Alignability evaluation || JC/CJ ||Due 2006/10/23 ||10% done || ||19 ||Modulator requirements || DFB ||Due 2006/07/31 ||0% done || ||20 ||Modulator tip-tilt tests || JC ||Due 2006/09/25 ||20% done || ||21 ||Signal-to-noise calculation || JSY ||Due 2006/10/09 ||30% done || ||22 ||Slide tests Phase 2 (2 slides, OPD repeatability) || CP ||Due 2006/10/16 ||Awaiting slide || ||23 ||Imaging speed calculation || JSY ||Due 2006/10/23 ||Waiting on 21 || ||24 ||Costing || JSY ||Due 2006/10/23 ||Waiting on 10 || ||25 ||Final Report || JSY ||Due 2006/11/06 || ||26 ||Preliminary design for downselected concept || FB/JC ||Due 2006/11/27 ||
March 09, 2007, at 05:06 PM
by John Young - Original milestones from workpackage definition
Added lines 3-30:
||! Milestone ||! Person(s) ||! Status || ||Beam size memos || DFB ||Delivered || ||Generic Switchyard Requirements || JC ||Delivered || ||Devise slide tests || CJ ||Complete || ||Survey of commercial slides || CP ||Complete || ||Generic Detector Requirements || JSY ||Delivered || ||P4S combiner optimization || JC ||Complete || ||P4S switchyard optimization || JC ||Complete || ||P8 combiner optimization || JC ||Complete || ||P8 (internal) switchyard optimization || JC ||Complete || ||P4/P8 manufacturer dialogue || JC ||Due 2006/07/31 || ||P4S/P8 spectrograph optimization || CJ ||Due 2006/09/01 || ||I4S combiner optimization || FB ||Due 2006/07/17 || ||I4S switchyard optimization || JC ||Complete || ||I6 combiner optimization || FB ||Due 2006/07/17 || ||Optical interface with fringe tracker || JC/CJ ||Due 2006/08/14 || ||Slide tests Phase 1 (1 slide, tip-tilt repeatability) || CP ||Due 2006/08/14 || ||Spatial filter evaluation || MCE ||Due 2006/09/11 || ||Alignability evaluation || JC/CJ ||Due 2006/10/23 || ||Modulator requirements || DFB ||Due 2006/07/31 || ||Modulator tip-tilt tests || JC ||Due 2006/09/25 || ||Signal-to-noise calculation || JSY ||Due 2006/10/09 || ||Slide tests Phase 2 (2 slides, OPD repeatability) || CP ||Due 2006/10/16 || ||Imaging speed calculation || JSY ||Due 2006/10/23 || ||Costing || JSY ||Due 2006/10/23 || ||Final Report || JSY ||Due 2006/11/06 || ||Preliminary design for downselected concept || FB/JC ||Due 2006/11/27 ||
March 09, 2007, at 03:31 PM
by John Young -
Changed lines 1-2 from:
Workpackage Definition: (Attach:)downselect_defn.pdf
to:
[[(Attach:)downselect_defn.pdf | Workpackage Definition]]
March 09, 2007, at 03:30 PM
by John Young -
Changed lines 1-2 from:
to:
Workpackage Definition: (Attach:)downselect_defn.pdf
March 09, 2007, at 03:04 PM
by John Young -
Added lines 1-2:
March 09, 2007, at 01:05 PM
by John Young -
Added lines 1-6:
The following beam combiner concepts are being considered:
* [[P4S]] * P8 * I4S * I6
|