Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mso.anu.edu.au/gallery3/index.php/reconstruction/album36/DSCN1056
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 02:18:46 2016
Кодировка: IBM-866

Поисковые слова: http www.iki.rssi.ru
As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well.

 

Photo info

Navigator

  • Hallway. Note the shonky brick-on-edge internal wall construction.
  • One of the internal fireplaces.
  • Some of the HABKA team at smoko.
  • The PDS and some air-conditioning relics, ready for junking.
  • As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well.
  • Clearing the front offices. Note the collapsed wall.
  • Same area later the same day, from the other side.
  • Roofing removed from walkways and outbuildings of main block.
  • Western end of main hall, now clear.

As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well.

                                                                                                                As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well.                                 More
As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well. NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission.