Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mso.anu.edu.au/gallery3/index.php/reconstruction/album36/DSCN0945
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 01:57:20 2016
Кодировка: IBM-866

Поисковые слова: lunar module
Library and heliostat tower before start of cleanup.

 

Photo info

Navigator

  • Piles of scrap metal and barrow-loads aof ash begin to grow in the courtyard.
  • In each room, the ash and rubbish is checked for relics of use, the barrowed into individual piles, one per room.
  • After a final check, the metal is carted off to the dump.
  • The library annexe. Fine ash is all that's left of fine old volumes.
  • Library and heliostat tower before start of cleanup.
  • Part of the ash pile from the business manager's office.
  • Peter Conroy looking through the plan files. Drawers full of melted plastic and ash.
  • What was this???
  • Remains of dewars and small instruments from the drawing office.

Library and heliostat tower before start of cleanup.

                Library and heliostat tower before start of cleanup.                                                                                                                                 More
Library and heliostat tower before start of cleanup. NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission.