Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mso.anu.edu.au/gallery3/index.php/reconstruction/album36/DSCN0943
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 01:57:11 2016
Кодировка: IBM-866

Поисковые слова: п п п п п р п р п р п р п р п р п р п р п р п р п р п р п
After a final check, the metal is carted off to the dump.

 

Photo info

Navigator

  • All floors are covered with ash and rubble.
  • Starting on the business manager's old office.
  • Piles of scrap metal and barrow-loads aof ash begin to grow in the courtyard.
  • In each room, the ash and rubbish is checked for relics of use, the barrowed into individual piles, one per room.
  • After a final check, the metal is carted off to the dump.
  • The library annexe. Fine ash is all that's left of fine old volumes.
  • Library and heliostat tower before start of cleanup.
  • Part of the ash pile from the business manager's office.
  • Peter Conroy looking through the plan files. Drawers full of melted plastic and ash.

After a final check, the metal is carted off to the dump.

            After a final check, the metal is carted off to the dump.                                                                                                                                     More
After a final check, the metal is carted off to the dump. NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission.