Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mso.anu.edu.au/gallery3/index.php/reconstruction/album36
Дата изменения: Unknown
Дата индексирования: Sun Apr 10 23:28:16 2016
Кодировка: IBM-866

Поисковые слова: m 106
Salvaging the CSO administration building

 

Album info

Salvaging the CSO administration building

  • By May 2004, 16 months after the firestorm, weeds are everywhere.

    • By May 2004, 16 months after the firestorm, wтАж
  • First step, collect all the loose metal scrap.

    • First step, collect all the loose metal scrapтАж
  • All floors are covered with ash and rubble.

    • All floors are covered with ash and rubble.
  • Starting on the business manager's old office.

    • Starting on the business manager's old oтАж
  • Piles of scrap metal and barrow-loads aof ash begin to grow in the courtyard.

    • Piles of scrap metal and barrow-loads aof ashтАж
  • In each room, the ash and rubbish is checked for relics of use, the barrowed into individual piles, one per room.

    • In each room, the ash and rubbish is checkedтАж
  • After a final check, the metal is carted off to the dump.

    • After a final check, the metal is carted offтАж
  • The library annexe. Fine ash is all that's left of fine old volumes.

    • The library annexe. Fine ash is all that'тАж
  • Library and heliostat tower before start of cleanup.

    • Library and heliostat tower before start of cтАж