Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mso.anu.edu.au/~rmn/upgrade.htm
Дата изменения: Wed Feb 16 17:10:03 2005
Дата индексирования: Mon Oct 1 20:43:18 2012
Кодировка:

Поисковые слова: cygnus loop
Siding Spring Survey Upgrade
Uppsala Schmidt Telescope and SSS Logo

 

Upgrade 2005

At the end of December 2004, the CCD was removed from the telescope and returned to Spectral Instruments in Tucson.  The existing thick chip will be replaced with a thinned chip and the readout changed from 2-channel to 4-channel.  This will result in a fainter limiting magnitude, faster readout and, hopefully, an increased discovery rate!  However, until the CCD is reinstalled, no observations will be made with the Uppsala.

Additional changes being made during this period include the installation of a compress air drier, collimating camera and cloud monitoring camera.

 

 Back to Recent News List 


           Siding Spring Survey Main Page     

           Equipment     

           Discoveries     

           Follow-up Astrometry with the 1.0-m at SSO     

           Previous News Items     

           Anglo-Australian Near Earth Asteroid Survey 1990-96     

           Links