Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/bal9.htm
Дата изменения: Wed May 28 21:15:01 2014 Дата индексирования: Sun Apr 10 02:49:26 2016 Кодировка: Поисковые слова: m 5 |
Trajectory report № 9 |
25.01.2001 |
---|
(OC "MIR")
Date |
25.01.2001 |
Flight orbit number (day) |
85416 (01) |
Orbit period (in min) |
90.400 |
Mean orbit altitude (km) |
296.8 |
Daily average altitude decay (km) |
0.40 |
Beta angle, i.e. the angle of the Sun vector to the orbital plane (in degrees) |
62.2 |
Duration of daylight (min) |
66.5 |
Solar and geomagnetic activity current parameters:
solar F10.7 flux geomagnetic index юП |
165 19 |
F10.7 <= 100 - low level; 100 < F10.7 < 150 - medium level; F10.7 >= 150 - high level
Re-entry
prediction with consideration of 15% deviation
solar flux activity value – 7.03.2001 ±7days.
Time of altitude мav ~ 250 km – 01.03.2001 ± 5days.
Date of the orbit parameters calculations
25.01.2001.Scheduled operations on "MIR"
Cargo ship "Progress M-43" (№243) undocked the station, burn ~ 9.5 m/s was executed to break it out from the Station "Mir" |
25.01.2001 08.16. 30 |
Cargo ship "ProgressM1-5"docking |
27.01.2001 ~ 08. 30 |
Cargo ship "Progress M-43" dumping after "ProgressM1-5" docking |
|
"Mir" operations scheduled for Jan 25.2001 completed. TV-display, radiomonitoring, telemetry data used to check out the systems. The Orbital complex remains pressurized. The onboard systems perform nominal. Attitude is controlled by jets. 08.19.23 "Progress" 243 undocked OC "Mir". "Progress" 243 breakout from the Station performed (нV=9,5 m/sec); the Station is switched to the spinning mode. |