Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press3101.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 03:01:05 2016
Кодировка:

Поисковые слова: annular solar eclipse
Press release

Press release

31.01.2001 

Press release for  January 31,  2001 09.00  a.m.(Moscow time)

"Mir"-"Progress M1-5" flight operations scheduled for Jan. 30-31 completed.

The Station and cargo ship onboard systems checked out, the orbit radiomonitoring performed. The Station keeps floating in  spinning  mode with the MCS (motion control system) in free drift. The Station remains pressurized onboard systems perform nominal. The cargo ship  onboard systems  are normal. No issues.

The Station and the cargo ship  onboard systems checkout is expected on Jan.31-Feb.1.