Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press2102.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 03:00:11 2016
Кодировка:

Поисковые слова: rigel
Press release

Press release 

 21.02.2001

Press release 

February 21 2001 09:00 (Moscow time)

The OC "MIr" and the cargo ship operations scheduled for 20-21 Feb. complete. The onboard systems of the Station and the cargo ship checked out, the orbit monitoring performed.

The Station remains pressurized, the onboard systems perform norminal. The station keeps in spinning mode with the MCS in free drift. The batteries generate enough electricity.

The current flight of the Orbital Complex "MIR" is under constant control of TsUp and Ground Command complex.


The OC "Mir" and the cargo ship onboard systems check out and the orbit monitoring are scheduled for 21-22 feb 2001.