Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press2003.htm
Дата изменения: Wed May 28 21:15:02 2014 Дата индексирования: Sun Apr 10 03:00:08 2016 Кодировка: Поисковые слова: п п п п п п п |
Press release |
20.03.2001 |
---|
Press release
March 20 2001 09:00 (Moscow time)
The operations with OC "Mir" scheduled for March 19 are complete.
A routine check out of the OC "Mir" onboard systems was performed during the previous day, its trajectory parametres registered.
The recent telemetry data confirmed the OC "Mir" pressure integrity, reported normal thermal mode and onboard systems norminal operation with the OC 'Mir" MCS in free drift.
The OC "Mir" keeps rotating in free drift, the solar batteries provide enough electric power.
Today Inter-departmental commission on the OC "Mir" final stage accepted a plan which states:
-stabilization of the complex in orbit is scheduled for March 22;
-the OC "Mir" re-entry is scheduled for March 23;
The OC "Mir" re-entry timeline will be issued tomorrow, March 21.