Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press1503.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 02:59:39 2016
Кодировка:

Поисковые слова: titan
Press release

Press release 

 15.03.2001

Press release 

March 15 2001 09:00 (Moscow time)

The operation with OC "Mir" scheduled for March 14 is complete.

The recent telemetry data confirmed the OC"Mir" remains pressurized. The onboard systems perform nominal, the battery generate enough electric power, the thermal condition is normal.

Getting the OC"Mir" ready for dynamic operations the fuel containers pressure integrity was checked, the valves of the fuel supply pipes and the 1st collector oxidizer in the core block integrated propulsion system were opened.

The next status report will be issued on March 16.