Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press1303.htm
Дата изменения: Wed May 28 21:15:02 2014 Дата индексирования: Sun Apr 10 02:59:26 2016 Кодировка: Поисковые слова: р р р р с с р с р р р с с п |
Press release |
13.03.2001 |
---|
Press release
March 13 2001 09:00 (Moscow time)
The operation with OC "Mir" scheduled for March 12 is complete.
During the previous day apart from routine OC "Mir" onboard systems checkout and orbit parametres monitoring, command software was uploaded into MCS Central Onboard computer. The MCS is in free drift.
The received telemetry data was used to assess the onboard systems performance, thermal and humidity condition and complex pressure integrity.
MCS operation was controled on the core block TV display readings.
Sollar arrays generate enough power, so spinning wasn't updated. The complex remains in free drift.
The next status report will be issued on March 14.