Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press1203.htm
Дата изменения: Wed May 28 21:15:02 2014 Дата индексирования: Sun Apr 10 02:59:16 2016 Кодировка: Поисковые слова: п п п п п п п п п п п п п п п п |
Press release |
12.03.2001 |
---|
Press release
March 12 2001 09:00 (Moscow time)
The operations sheduled with OC "Mir" for March 11 are fully complete.
The station continues in free drift.
The recent telemetry data confirmed the OC "Mir" remains sealed. The onboard systems perform nominal, the Complex arrays generate enough electricity, the thermal mode is normal.
Today on the Station (core block) the Motion Control System (MCS) digital central computer was powered on, it is being loaded with command software.
The next status report is scheduled for March 13 2001.