Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0903.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 02:58:58 2016
Кодировка:

Поисковые слова: закон вина
Press release

Press release 

 09.03.2001

Press release 

March 09 2001 09:00 (Moscow time)

The operations scheduled on OC "Mir" for March 8 are complete.

The recent telemetry data confirmed that the complex remains pressurised, the thermal mode is normal, the onboard systems perform norminal. Enough electricity is generated to maintain the onboard systems operation and measure orbit parameters.

The OC "Mir" onboard systems were checked out, orbit radio monitoring performed.

Currently, the OC "Mir" is in free drift.

The next status report is scheduled for March 10 2001.