Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0702.htm
Дата изменения: Wed May 28 21:15:02 2014 Дата индексирования: Sun Apr 10 02:58:31 2016 Кодировка: Поисковые слова: interacting galaxies |
Press release |
07.02.2001. |
---|
Press release for Feb. 7, 2001 09.00 a.m. (Moscow time)
The Station "Mir" and cargo ship "Progress M1-5"operations scheduled for 6-7 Feb. completed.
To increase power generation the Station's attitude in inertial coordinate system is controlled by jets with the spinning about its longitudinal axis of 0,25 degrees /sek.The Station and the cargo ship onboard systems checked out, the orbit radiomonitoring performed.
The Station remains pressurized, the onboard systems perform nominal. The Station keeps in spinning mode with the MCS (motion control system) in free drift.
The Station "Mir" parameters for Feb. 6:
-
average altitude-
orbit period - 90,2 min.The onboard systems further checkout and the orbit radiomonotoring are
scheduled for Feb. 7-8.