Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0503.htm
Дата изменения: Wed May 28 21:15:01 2014 Дата индексирования: Sun Apr 10 02:58:09 2016 Кодировка: Поисковые слова: rosat |
Press release |
05.03.2001 |
---|
Press release
March 05 2001 09:00 (Moscow time)
The OC "Mir" operations scheduled for March 4 are complete.
Currently,the OC "Mir" is in free drift, its aerodynamic deceleration in the upper atmosphere continues.
The OC "Mir" onboard systems were checked out and orbit radio monitoring performed during the recent communication sessions.
The recent telemetry data confirmed that the complex remains pressurised, the thermal mode is normal, the onboard systems perform norminal. Enough electricity is generated to maintain the onboard systems operation, to control their performance and measure orbit paramatres.
The next status report is expected on March 6, 2001.