Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0102.htm
Дата изменения: Wed May 28 21:15:01 2014 Дата индексирования: Sun Apr 10 02:57:44 2016 Кодировка: Поисковые слова: tail |
Press release |
01.02.2001 |
---|
Press release for February 01, 2001 9 a.m (Moscow time)
"Mir"- "Progress M1-5" flight operations scheduled for Jan.31-Feb.1 completed.
"Mir" and "Progress M1-5" onboard systems checked out. The Station is in a spinning mode with the MCS (motion control system) in free drift. The telemetry data indicate the Station remains pressurized, the Station and "Progress M1-5" systems perform nominal. "Progress M1-5" onboard systems are normal, no issues.
The Station and cargo ship onboard systems checkout is scheduled for Feb. 1-2.