STS Recordation Oral History Project
This effort
involved the collection of history from key individuals formerly
and currently associated with the agency’s Space Shuttle
Program (SSP), focusing on the Space Shuttle Orbiter and its
related components. These interviews include information on
a number of Space Shuttle Program aspects from concept development
to retirement, and focus on design, hardware evolution, and
changes in response to the two Space Shuttle accidents.
For more
information on Space Shuttle Recordation, visit the Website:
http://www.nasa.gov/agency/crm/shuttle/
Barauskas, Stan
M.
8-24-10 (206K) |
Manager
and Design Engineer for Shuttle Auxiliary Power Unit (APU),
Downey, CA |
Bartolone,
Anthony P.
7-5-11 (108K) |
Lead
Project Engineer, ET and SRB Processing, Kennedy Space
Center, FL |
Blackburn,
Gerald A.
8-24-10 (154K) |
Project
Manager, Material and Processes, Downey, CA |
Carlton,
James A.
7-13-11 (128K) |
Program
Manager, SRB, Kennedy Space Center, FL |
Chaput,
Joseph P.
7-13-11 (119K) |
Manager,
Marine Operations, Kennedy Space Center, FL |
Emde,
Wendall D.
8-27-10 (119K) |
Thermal
Protection System development, Associate Program Manger,
Downey, CA |
Emero,
Donald H.
8-26-10 (96K) |
Shuttle
Systems Design, Thermal Protection System Development;
Vice President Engineering, Downey, CA |
Ferris,
Frances A.
8-24-10 (111K) |
Chief
Project Engineer, Orbiter Design & Requirements; Purge,
Vent & Drain/Thermal Control System Analyst and Supervisor;
Downey, CA |
Goetz,
Otto K.
7-20-10 (85K) |
Space
Shuttle Main Engines Chief Engineer and Project Manager,
Marshall Space Flight Center, Huntsville, AL |
Hopson,
George D.
7-20-10 (129K) |
Space
Shuttle Main Engines Project Manager, Marshall Space Flight
Center,
Huntsville, AL |
Kahl,
Robert H.
8-25-10 (112K) |
Direction
of Operations, Rockwell International/Boeing Space Systems,
Palmdale, CA |
Kramer
White, Julie A.
4-26-11 (182K) |
Space
Shuttle Orbiter Structural Subsystem Manager, Systems
Engineer, Johnson Space Center, Houston, TX |
Lindstrom,
Robert E.
7-19-10 (64K) |
Shuttle
Projects Office Manager, Marshall Space Flight Center,
Huntsville,
AL |
Lucas,
William R.
7-21-10 (121K) |
Director,
Marshall Space Flight Center, Huntsville, AL |
McCool,
Jr., Alex A.
5-11-11 (149K) |
Director
of the Structures and Propulsion Laboratory, Marshall
Space Flight Center, Huntsville, AL |
McCormack,
Donald L.
3-24-11 (130K) |
Ferry
Operations Manager, Johnson
Space Center, Houston, TX |
Mitchell,
Royce E.
6-30-10 (159K) |
Reusable
Solid Rocket Motor Project Manager, Solid Rocket Motor
Redesign after Challenger Accident, Marshall Space Flight
Center, Huntsville,
AL |
Moser,
Thomas L..
4-9-10 (167K)
5-27-10 (92K) |
Chief,
Structural Design; Thermal Protection System Engineering
Design, Johnson Space Center, Houston, TX |
Odom,
James B.
7-20-10 (101K) |
External
Tank Project Manager, Marshall Space Flight Center, Huntsville,
AL |
Pessin,
Myron A. "Mike"
6-30-10 (223K) |
External
Tank Chief Engineer, Marshall Space Flight Center,
Huntsville, AL |
Ransone,
Eric S.
7-13-11 (174K) |
Operations
Flow Manager, Space Shuttle Main Enginer, Kennedy Space
Center, FL |
Roberts,
William J.
8-25-10
(169K)
8-26-10 (73K)
4-15-12 (77K) |
Project
Manager for Shuttle Retirement; Vehicle Project Manager
for OV-103 (Discovery), Huntington Beach, CA |
Schwinghamer,
Robert J.
7-20-10 (135K) |
Associate
Director, Technical; Materials Lab Director, Marshall
Space Flight Center,
Huntsville, AL |
Sheehan,
Gerald D.
7-12-11 (153K) |
Columbia
Vehicle Manager, Orbiter Engineering, Kennedy Space Center,
FL |
Singer,
Jody A.
7-21-10 (81K) |
Deputy
Manager, Propulsion Office; Solid Motor Rocket/Reusable
Solid Motor Rocket Manager; Marshall Space Flight Center,
Huntsville, AL |
Smith,
Gerald W..
5-12-11 (184K) |
Solid
Rocket Booster Redesign, Engineer, Space Shuttle Main Engine,
Marshall Space Flight Center, Huntsville, AL |
Stilson,
Stephanie S.
7-14-11
4-13-12 |
Flow
Direcotr for Discovery, Kennedy Space Center, FL |
Henry
T. Taylor
8-26-11 (113K) |
Flight
Engineer and Aircraft Maintenance Officer, Johnson Space
Center, Houston, TX |
Thomas,
John W.
6-29-10 (113K) |
Led
Solid Motor Rocket Redesign after Challenger Accident;
Program Manager Advanced Solid Motor Rocket Contractor;
Marshall Space Flight Center, Huntsville, AL |
Thompson,
J. R.
5-13-11 (67K) |
Space
Shuttle Main Engine Project Manager, Marshall Space Flight
Center, AL |
Tribe,
John
7-13-11 (138K) |
Director,
Launch Support Services Systems Engineering, Chief Engineer,
Orbiter Engineering, Kennedy Space Center, FL |
White,
Terrence R.
7-12-11 (170K) |
Project
Lead, Thermal Protection System, Kennedy Space Center, FL |
|
More transcripts
are available from the alphabetical list above or from the complete
list of participants.
Please note: Links on the following pages are active once the
Oral History transcript is archived in the JSC History Collection.
To view
the newest additions to the JSC History Collection, visit
the "What's New" announcement.
Transcript
lists were last updated: Dec.
30, 2015
|