Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.iki.rssi.ru/vprokhor/intmins/shift.htm
Дата изменения: Tue Apr 20 10:05:46 1999 Дата индексирования: Tue Oct 2 10:46:03 2012 Кодировка: Поисковые слова: t tauri |
|
The INTMINS April 1999 operations
schedule was done on the base of the MIR ground track long-term
prediction using the MIR's orbital elements status on 29/03/99.
|
The investigation of the time shift behaviour was began before 29/03/99 on the base of the different orbital elements determined (by KIAM RAN) 22/03/99, 25/03/99 and continued on the base of the orbital elements determined at 31/03/99, 5/04/99.